My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EASEMENT AFN 201907310975 <br />PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL405 <br />29051900201000 <br />UNKNOWN <br />EASEMENT AFN 201907310975 <br />361LF <br /> <br />C <br />O <br />N <br />C <br /> <br />G <br />U <br />T <br />T <br />E <br />R <br /> <br />T <br />O <br /> <br />C <br />B <br />7 <br />SAWCTSAWCT <br />TCETCETCETCETCETCETCETCETCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />TCE <br />SAWCT SAWCT SAWCT SAWCT SAWCT SAWCT <br />SAWCT SAWCT SAWCT <br />F <br />CD-2609 <br />EX FENCE <br />EX 32" HDPE DWO <br />PORT OF EVERETT <br />NORTON TERMINAL <br />APPROXIMATE LOCATION OF <br />TRENCHLESS LAUNCH PIT <br />21 <br />31 <br />BNSF ROWLIMIT OF EXISTING CITY <br />UTILITY EASEMENT <br />39+00 40+0041+0042+00STA. 40+11± CO19 (C-2108) <br />APPROXIMATE LOCATION OF <br />EXISTING PAVEMENT CHANGE <br />BNSF ROW <br />LIMIT OF TCE AREA 2. <br />SEE G-2014. <br />TCE AREA 2 <br />TCE AREA 3 <br />PE AREA 4 <br />APPROXIMATE EXTENTS OF <br />H-PILES AND FOUNDATION <br />NORTON TERMINAL ASPHALT <br />PAVEMENT (NO GEOGRID) <br />NORTON TERMINAL ASPHALT <br />PAVEMENT (MULTILAYER GEOGRID) <br />1 <br />- <br />2 <br />- <br />LIMIT OF TCE AREA 3. <br />SEE G-2014. <br />2" MILL AND HMA PAVEMENT <br />PLANTING RESTORATION IN KIND <br />SCALE: <br />1 <br />VARIES SCALE: <br />2 <br />VARIES9"EX HMA18"CSBCNORTON TERMINAL <br />FINISHED GRADE <br />12" <br />MIN <br />BOTH <br />SIDES <br />TRENCH WIDTH PER CONTRACTOR <br />MIN SIDE CLEARANCE PER COE DETAIL 614 <br />INITIAL SAW CUT (TYP) PER <br />ACCEPTED EXCAVATION PLAN <br />FINAL SAW CUT (TYP) <br />SEE GENERAL NOTE 5 <br />EX ASPHALT <br />PAVEMENT <br />EX AGGREGATE <br />BASE (CSBC) <br />AGGREGATE <br />BASE (CSBC) <br />TRENCH BACKFILL PER COE DETAIL <br />614 AND SECTION 31 23 00. <br />GEOGRID LAYERS PER SECTION 31 05 19. <br />12" MIN <br />BOTH SIDES <br />MILL AND OVERLAY <br />9"EX HMA18"CSBCNORTON TERMINAL <br />FINISHED GRADE <br />12" <br />MIN <br />BOTH <br />SIDES <br />TRENCH WIDTH PER CONTRACTOR <br />MIN SIDE CLEARANCE PER COE DETAIL 614 <br />INITIAL SAW CUT (TYP) PER <br />ACCEPTED EXCAVATION PLAN <br />EX AGGREGATE <br />BASE (CSBC) <br />AGGREGATE BASE (CSBC) <br />TRENCH BACKFILL PER COE DETAIL <br />614 AND SECTION 31 23 00. <br />GEOGRID LAYERS (SINGLE OR MULTIPLE <br />LAYERS) PER SECTION 31 05 19. <br />EX GEOGRID <br />LAYERS <br />FINAL SAW CUT (TYP) <br />SEE GENERAL NOTE 5 <br />EX ASPHALT <br />PAVEMENT <br />MILL AND OVERLAY <br />NTS <br />NORTON TERMINAL ASPHALT PAVEMENT <br />RESTORATION WITH MULTI-LAYER GEOGRID <br />NTS <br />NORTON TERMINAL ASPHALT <br />PAVEMENT RESTORATION <br />HMA PAVEMENT MULTI-LAYER GEOGRID. <br />SEE DETAIL 2/CX-2011. <br />9" ASPHALT PAVEMENT OVER 12" CSBC. <br />SEE DETAIL 1/CX-2011. <br />HMA PAVEMENT, FULL DEPTH <br />?Surveyed By # Date # Control Monument # City of Everett Field Book/Starting Page # / ###Filepath\FilenameC:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\XXX DEMO\SHEETS\CX-2011.DWGPlot date 12/8/2025 8:49 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name ####################### <br />DEMOLITION <br />NORTON TERMINAL <br />EXISTING PAVEMENT DEMOLITION - 1 <br />CX-2011 <br />13 <br />R. DAVIES, P. VENC <br />T. FRANKLIN <br />R. DAVIES <br />PLAN <br />SCALE: 1"=20" <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br /> <br />Know what's below. <br />before you dig.Call <br />R <br />GENERAL NOTES <br />KEY NOTES <br />LEGEND <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING WORK. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF THEIR FAILURE <br />TO EXACTLY LOCATE AND PROTECT ALL EXISTING <br />UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND SNOPUD <br />REQUIREMENTS. COORDINATE CONSTRUCTION <br />ACTIVITIES AND SCHEDULE WITH UTILITY OWNER'S. <br />SEE SECTION 02 01 10 AND SECTION 02 01 20. <br />3.LIMITS OF PAVEMENT ARE SHOWN BASED ON BEST <br />AVAILABLE RECORD INFORMATION. EXISTING <br />PAVEMENT DEMOLITION SHALL BE PERFORMED AS <br />REQUIRED TO COMPLETE THE WORK. CONTRACTOR <br />SHALL DETERMINE THE ACTUAL LIMITS REMOVED <br />BASED ON THEIR APPROVED TRENCHING AND <br />RESTORATION PLANS. <br />4.SEE ADDITIONAL DEMOLITION REQUIREMENTS IN <br />SECTION 02 41 00. <br />5.FINAL SAW CUT SHALL BE DONE TO ACCURATE, NEAT <br />AND STRAIGHT LINES. PROVIDE SAND FOR CRACK <br />SEALING PER WSDOT/APWA 5.03.3(3)B2 AND JOINT <br />SEALANT PER 9-04.2. <br />6.ALL STRIPPING, MARKERS, AND SURFACE <br />IMPROVEMENTS REMOVED OR DAMAGED BY THE <br />WORK MUST BE REPLACED TO THE PORT'S <br />REQUIREMENTS <br />MATCHLINE SEE DRAWING CX-20121 PROVIDE INITIAL SAW CUT TO REMOVE EXISTING <br />PAVEMENT. WHERE PRESENT, CUT EXISTING <br />GEOTEXTILE/GEOGRID. TAKE CARE TO MINIMIZE <br />DAMAGE TO THE MATERIAL DURING THE REMOVAL <br />AT THE SAW CUT BOUNDARY. <br />2 PROVIDE FINAL SAW CUT AND RESTORATION IN <br />ACCORDANCE WITH DETAIL 1, THIS SHEET. <br />3 PROVIDE FINAL SAW CUT AND RESTORATION OF <br />GEOTEXTILE/GEOGRID PER DETAIL 2, THIS SHEET. <br />10 402020FEET0 <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.