Laserfiche WebLink
36+002 <br />0 <br />+ <br />0 <br />0 <br />21+00 <br />22+00 <br />23+00 <br />24+00 <br />25+00 <br />26+00 <br />27+0028+0029+0030+0031+0032+0033+0034+0035+0021ST ST20TH ST19TH STRUCKER AVE <br />HOYT AVE 19TH STGRAND AVE C-2212C-2213C-2211 <br />C-2210 <br />BEGIN 20" FM CO03 <br />STA. 20+09.79 <br />END 18" FM CO03 SLIP LINE <br />STA. 32+98.55 <br />BEGIN 18" SLIP LINE <br />STA. 26+95.07 <br />18" FM CO03 <br />NAVAL STATION EVERETT <br />REMOVE AND REPLACE EXISTING <br />TRANSITION STRUCTURE <br />20" FM CO03 <br />WEST MARINE <br />V <br />I <br />E <br />W <br /> <br />D <br />R <br />I <br />V <br />E <br />BNSF RR <br />C:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2032.DWGPlot date 12/8/2025 10:25 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY44572 <br />   <br />CIVIL <br />SITE AND KEY PLAN <br />C-2032 <br />19 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />SEWER FORCE MAIN KEY PLAN <br />SCALE: 1"=80'40 1608080FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />GENERAL NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20.Filepath\Filename12/09/2025