My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:02:45 PM
Creation date
4/21/2026 1:47:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
20+00 <br />21+00 <br />22+00 <br />23+00 <br />24+00 <br />25+00 <br />26+00 <br />27+00 <br />28+00 <br />29+00 <br />30+00 <br />31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 <br />21ST ST20TH ST19TH ST18TH ST19TH ST18TH STGRAND AVE <br />WEST MARINE VIEW DRIVE <br />C-2313C-2312 <br />C-2311 <br />C-2310 <br />BEGIN 48" SD CO02 <br />STA. 21+17.33 <br />NAVAL STATION EVERETT <br />BNSF RR <br />48" SD CO02 <br />WO UP3525 <br />(BY OTHERS) <br />CO02 <br />39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 <br />16TH ST17TH ST18TH STC-2315C-2314 <br />END 48" SD CO02 <br />STA. 47+18.63 <br />CO02 TEE ASSEMBLY <br />AND STANDPIPE <br />STA. 47+06.53 <br />CO02 <br />WEST MARINE VIEW DRIVE <br />GRAND AVENUE PARK BRIDGE <br />C:\USERS\TFRANKLIN\DC\ACCDOCS\BC ACC PROJECT HUB\103977 - EVERETT CONVEYANCE PACKAGES A_C_E\PROJECT FILES\300 DESIGN\UP3815-02\CAD\002 C\SHEETS\3815-02-C-2033.DWGPlot date 12/8/2025 10:24 AM Plotted by Travis Franklin Last saved by TFranklin Plot style Everett-2016.stb Sheetset Name Everett Sheetset 2016Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov <br />PORT GARDNER STORAGE FACILITY <br />WEST MARINE VIEW DRIVE <br />STORM AND COMBINED SEWER DESIGN <br />WORK ORDER UP3815-02 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />142RECORD <br />Of Total <br />Sheet No. <br />Drawing <br />PRELIMINARY <br />44572 <br /> <br />CIVIL <br />SITE AND KEY PLAN <br />C-2033 <br />20 <br />R. DAVIES <br />T. FRANKLIN <br />K. WEBER <br />STORM DRAIN KEY PLAN <br />SCALE: 1"=80' <br />40 1608080FEET0 <br />Know what's below. <br />before you dig.Call <br />R <br />MATCHLINESEE ABOVE RIGHTMATCHLINESEE BELOW LEFTSTORM DRAIN KEY PLAN <br />SCALE: 1"=80' <br />GENERAL NOTES <br />1.THE EXISTING UNDERGROUND UTILITIES SHOWN <br />HEREIN ARE APPROXIMATE LOCATIONS ONLY BASED <br />ON THE FIELD LOCATION OF UTILITY LOCATE PAINT <br />MARKS AND PHYSICAL FEATURES VISIBLE ON OR <br />ABOVE THE GROUND SURFACE. THE CONTRACTOR <br />SHALL DETERMINE THE LOCATION OF ANY AND ALL <br />UNDERGROUND UTILITIES BEFORE BEGINNING <br />WORK. THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ANY AND ALL DAMAGES ARISING OUT OF THEIR <br />FAILURE TO EXACTLY LOCATE AND PROTECT ALL <br />EXISTING UTILITY FACILITIES. <br />2.WORK AROUND POWER AND GAS UTILITIES MUST BE <br />PERFORMED IN ACCORDANCE WITH PSE AND <br />SNOPUD REQUIREMENTS. COORDINATE <br />CONSTRUCTION ACTIVITIES AND SCHEDULE WITH <br />UTILITY OWNERS. SEE SECTION 02 01 10 AND <br />SECTION 02 01 20.Filepath\FilenameSTORM DRAIN HGL <br />DWG#CO#STRUCTURE <br />NAME <br />INVERT <br />(FT) <br />HGL <br />(FT)NOTE <br />C-2310 CO02 SDMH 600 3.51 33.11 ACCESSWAY <br />C-2311 CO02 SDMH 601 2.97 34.21 ACCESSWAY <br />C-2312 CO02 SDMH 602 2.36 35.17 ACCESSWAY <br />C-2314 CO02 SDMH 603 1.75 36.18 ACCESSWAY <br />C-2315 CO02 SD CLEANOUT 1.13 36.85 CLEANOUT <br />HGL ELEVATION BASED ON 100-YR STORM <br />12/09/2025
The URL can be used to link to this page
Your browser does not support the video tag.