My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 32 16 - 2 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />01 32 16 - 2 CONSTRUCTION PROGRESS SCHEDULES AND REPORTS <br />B. Draft Project Schedule: <br />1. The initial Critical Path Method schedule (CPM) for the Contractors work that <br />includes the early start/finish and late start/finish dates for each contract activity, <br />milestone, constraint, significant contract activities and procurement of critical <br />materials specified in Division 1 through Division 40. <br />C. Baseline Schedule: <br />1. Includes revisions from the review comments of the Draft Project Schedule <br />submittal. <br />2. A CPM schedule that includes the Contractor’s complete plan and all the necessary <br />activities to perform the Contract work within the Contract Time including milestones <br />and constraints defined in the Contract. <br />D. Monthly Update Schedule: <br />1. Updates to the Baseline Schedule show the current construction schedule that <br />reflects actual progress to date, updating all changes to the Contract, and the <br />schedule plan to complete the work within the Contract Time. <br />E. Three Week Look-Ahead Schedule: <br />1. A three-week detailed look at work activities planned for this Period. Scope of detail <br />is to review the past week of progress and the future three weeks of planned work <br />activities. <br />2. Provide this schedule with greater detail than the CPM and prepare it in a format <br />that includes references to appropriate CPM schedule activity numbers and work <br />breakdown. <br />3. The three-week look-ahead schedule shall coordinate with the Monthly Update <br />Schedule. <br /> <br />1.3 SUBMITTALS <br />A. Procedures: Specification Section 01 33 00 Submittal Procedures. <br />B. Qualifications: Submit within fourteen (14) days after the effective date of the Notice to <br />Proceed. <br />C. Schedules: <br />1. Submit all schedules in accessible electronic data files in the software format in <br />which it was created and in PDF format. At a minimum, the data files shall provide <br />the CPM Network Diagram; tabular report listing of each activity by Early Start and <br />Total Float sorts; logic tie report providing the predecessor and successor for each <br />activity; precedence diagram; and earned value projections. <br />2. Draft Project Schedule: Submit within 45 days of NTP. This submittal will be <br />reviewed by the City’s Construction Manager as required in Specification Section 01 <br />33 00 Submittal Procedures to verify that the requirements of Specification Section <br />01 32 16 Construction Progress Schedules and Reports have been met and may <br />require more than one submission by the Contractor to attain a Review Action of 1 <br />(No Exceptions Taken) or 2 (Note Markings). When the Draft Project schedule
The URL can be used to link to this page
Your browser does not support the video tag.