Laserfiche WebLink
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Erosion and Sedimentation Control <br />Project No. 180162 31 25 00 - 3 <br /> <br />i. Locations and construction details of all ditches, berms, culvert pipes, pump <br />stations, enhanced treatment measures, sediment basins, filters, and basin <br />outfalls. <br />j. Location and design of all construction entrance(s) and wheel wash(es). <br />k. Installation, inspection, maintenance, and removal schedule for temporary <br />erosion control facilities. <br />l. Rerouting of existing surface and underground drainage pathways and facilities <br />within the site. <br />m. Location and design of traps, basins, and filters to collect transported sediment <br />before entering the existing drainage systems and disposal areas. <br />n. Location of outlets from subsurface drainage systems. <br />o. Methods of monitoring water quality and quantity. <br />p. Schedule for street sweeping of paved site areas/roads impacted by sediment or <br />dust. <br />q. Schedule, sequence, layout, and methods for transitioning between temporary <br />and permanent erosion control and drainage facilities, and the <br />removal/abandonment of existing drainage systems. <br />r. Methods to be used for erosion control in excavations, embankments, and for <br />boundary control <br />7. Stormwater Pollution Prevention Plan (SWPPP) <br />a. The Contractor shall complete and update the draft SWPPP to include, at a <br />minimum, designation of CESCL, detailed construction schedule, TESC details for <br />temporary facilities and access roads, TESC Plan, Stormwater Bypass Plan, and <br />additional best management practices (BMPs) as required by TESC Plan. <br />b. The Contractor shall submit additional SWPPP updates, prepared by CESCL, as <br />required for changing conditions, construction sequencing, or additional or <br />modification of BMPs. <br />8. Inspections and Reporting <br />a. Inspect BMPs in accordance with the schedule in the SWPPP. <br />b. The inspection reports shall follow the Construction Stormwater Site Inspection <br />Form provided in the SWPPP and include, but not be limited to: <br />1) Date and time of the inspection. <br />2) Name, title and signature of the person conducting the site inspection, a <br />phone number or other reliable method to reach this person, and the <br />following statement: “I certify that this report is true, accurate, and complete <br />to the best of my knowledge and belief.” <br />3) Weather information including, the general conditions during inspection and <br />the approximate amount of precipitation since the last inspection, and <br />precipitation within the last 24 hours. <br />4) When, where, and how TESC measures were installed, maintained, modified, <br />and removed. <br />5) Repairs needed, repairs made, and date when repairs were made. <br />6) Observations of TESC measures effectiveness and proper placement. <br />a) Quantitative measurement shall be provided, in part, by weekly <br />measurements of turbidity, transparency, and pH at discharge points. <br />7) Recommendations for improving performance of TESC measures