Laserfiche WebLink
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Surface Restoration <br />Project No. 180162 32 10 00 - 6 <br /> <br />3.04 PAVEMENT REPLACEMENT LIMITS <br />A. The approximate limits of required pavement replacement are shown on the Contract <br />Drawings. Pavement replacement should be considered as part of the means and <br />methods selected by the Contractor for their own convenience and as required by the <br />government agency having jurisdiction of the right-of-way as a result of the Contractor’s <br />work. <br />B. Except where specifically required elsewhere in these Specifications, provide a <br />permanent pavement replacement as follows: <br />1. In accordance with the requirements of the Agency Encroachment Permit/Street Cut <br />permit and applicable specifications. <br />2. If a cut is made in an asphalt surface under moratorium, three (3) years old or less, <br />the roadway will be rotomilled from the edge of each cut to the next designated lane <br />divider, curb or as directed by the Agency inspector, whichever is greater. <br />3. Recycled asphalt shall only be provided where allowed by the permitting agency. <br />4. For all older road surfaces, asphalt will be required for the length and width of the cut <br />with applicable pavement Restoration t-sections. Any adjustments may be required <br />by the Agency inspector/Engineer based on the location of any seams when <br />compared to the traveled paths upon the roadway. <br />5. Replace asphalt to lip of gutter if extent of surface repair is less than 5 feet from lip <br />of gutter. <br />6. Where composite pavements are present, provide flowable fill into all excavations <br />12” or less in width prior to application of an asphalt finished surface. <br />7. Pavement shall be replaced with the same type and thickness of asphalt to match <br />the existing asphalt or 4” inches, whichever is greater. <br />C. If Contractor’s operations cause damage to existing pavement beyond specified limits, <br />remove and replace damaged pavement to the limits required by the agency with <br />jurisdiction. <br />1. Replace any damaged or disturbed pavement not specified for removal at no <br />additional cost to the Owner. <br />2. Contractor’s means and methods which result in additional pavement replacement <br />shall be considered as part of the Contractor’s bid for their own convenience at no <br />additional cost to the Owner. <br />D. Contractor shall protect in place or replace pavement markings, traffic loops, and <br />signage as required by the government agency having jurisdiction of the right-of-way at <br />no additional cost to the Owner. <br />3.05 TEMPORARY PAVEMENT <br />A. Temporary pavements shall only be provided where allowed by permit issued by the <br />Agency having jurisdiction over the right-of-way.