Laserfiche WebLink
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 82 March 5, 2026 <br />1 Section 8-09.3 is supplemented with the following: <br />2 <br />3 8-09.3(5) Asphalt Adhesives <br />4 <br />5 Section 8-09.3(5) is supplemented with the following: <br />6 <br />7 Adhesive for blue raised pavement markers on all hot mix asphalt surfaces shall be <br />8 bituminous conforming to the requirements of Section 9-02.1(8) and be Crafco <br />9 #34269 or approved equal, or, shall be Flint Premark Bundy Adhesive #8430055BK <br />10 5 by 5 installed per manufacturers recommendations. <br />11 <br />12 8-09.4 Measurement <br />13 <br />14 Section 8-09.4 is supplemented with the following: <br />15 <br />16 Measurement of markers will be per hundred for markers furnished and in place. <br />17 <br />18 8-09.5 Payment <br />19 <br />20 Section 8-09.5 is supplemented with the following: <br />21 <br />22 Payment will be made in accordance with section 1-04.1, for the following Bid item included <br />23 in the Proposal: <br />24 <br />25 Raised Pavement Marker Type 2, per hundred. <br />26 <br />27 <br />28 GLF 8-13.docx <br />29 8-13 MONUMENT CASES <br />30 <br />31 Section 8-13 of the standard specifications is deleted and replaced by the following: <br />32 <br />33 (******) <br />34 8-13.1 Description <br />35 <br />36 This work will consist of adjusting existing survey monument cases to grade in accordance <br />37 with Standard Drawing No. 323 and these Special Provisions. <br />38 <br />39 8-13.2 Vacant <br />40 <br />41 8-13.3 Construction Requirements <br />42 <br />43 Existing monument castings shall be adjusted to grade in the same manner as for <br />44 manholes in Section 7-05.3(1) of these Special Provisions. <br />45 <br />46 8-13.4 Measurement <br />47 <br />48 Measurement of monument case and cover will be by the unit for each monument case <br />49 and cover adjusted to grade.