Laserfiche WebLink
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 86 March 5, 2026 <br />1 GLF 8-20.5.DOCX <br />2 8-20.5 Payment <br />3 <br />4 Section 8-20.5 is supplemented with the following: <br />5 <br />6 (******) <br />7 "Vehicle Loop Detectors," per linear foot. <br />8 <br />9 The unit contract price shall include saw cutting, cleaning and drying of pavement, <br />10 installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and <br />11 splicing between loop wire and lead-on cable, any work necessary to access a junction <br />12 box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. <br />13 <br />14 No payment shall be made for any loops that are not spliced and fully operational, including <br />15 any loop detector lead in cable required to make the loop operational. <br />16 <br />17 Loop Detector Lead-In Cable, per linear foot. <br />18 <br />19 The unit contract price shall be full pay for furnishing and installing each loop detector lead- <br />20 In cable in existing conduits between the traffic signal control cabinet and loop splice point, <br />21 including all and all other Work necessary terminate loop lead in cable at either end. <br />22 <br />23 No payment shall be made for any detector lead-in cable that is not spliced and fully <br />24 operational, including any testing required to make the loop operational. <br />25 <br />26 Conduit Pipe 2 In. Diam., per linear foot. <br />27 The unit contract price shall be full pay as described in this Section for furnishing and <br />28 installing each conduit stub-out where shown in the Plans, including furnishing all conduit, <br />29 elbows, bends, and fittings for placing the pipe in accordance with the above provisions, <br />30 including all excavation or jacking required, backfilling of any voids around stub out, pits, <br />31 or trenches; bedding of the pipe, chipping of pavement, and all other Work necessary for <br />32 the construction of the conduit stub-out. <br />33 <br />34 Video Detection System ____, lump sum. <br />35 <br />36 The lump sum Contract price for Video Detection System ____, shall be full pay for the <br />37 construction of the complete video detection system as described above and as shown in <br />38 the Plans, and herein specified, including complete installation of owner furnished <br />39 materials to provide a fully functioning video detection system at the location described. <br />40 The Contract price shall include restoring facilities destroyed or damaged during <br />41 construction, salvaging existing materials, and for making all required tests. All additional <br />42 materials and labor, not shown in the Plans or called for herein and which are required to <br />43 complete the video detection system, shall be included in the lump sum Contract price. <br />44 Removal and salvage of existing materials associated with the construction not shown in <br />45 the Plans or called for herein and which are required to complete the video detection <br />46 system, shall be included in the lump sum Contract price. <br />47 <br />48