My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 86 March 5, 2026 <br />1 GLF 8-20.5.DOCX <br />2 8-20.5 Payment <br />3 <br />4 Section 8-20.5 is supplemented with the following: <br />5 <br />6 (******) <br />7 "Vehicle Loop Detectors," per linear foot. <br />8 <br />9 The unit contract price shall include saw cutting, cleaning and drying of pavement, <br />10 installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and <br />11 splicing between loop wire and lead-on cable, any work necessary to access a junction <br />12 box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. <br />13 <br />14 No payment shall be made for any loops that are not spliced and fully operational, including <br />15 any loop detector lead in cable required to make the loop operational. <br />16 <br />17 Loop Detector Lead-In Cable, per linear foot. <br />18 <br />19 The unit contract price shall be full pay for furnishing and installing each loop detector lead- <br />20 In cable in existing conduits between the traffic signal control cabinet and loop splice point, <br />21 including all and all other Work necessary terminate loop lead in cable at either end. <br />22 <br />23 No payment shall be made for any detector lead-in cable that is not spliced and fully <br />24 operational, including any testing required to make the loop operational. <br />25 <br />26 Conduit Pipe 2 In. Diam., per linear foot. <br />27 The unit contract price shall be full pay as described in this Section for furnishing and <br />28 installing each conduit stub-out where shown in the Plans, including furnishing all conduit, <br />29 elbows, bends, and fittings for placing the pipe in accordance with the above provisions, <br />30 including all excavation or jacking required, backfilling of any voids around stub out, pits, <br />31 or trenches; bedding of the pipe, chipping of pavement, and all other Work necessary for <br />32 the construction of the conduit stub-out. <br />33 <br />34 Video Detection System ____, lump sum. <br />35 <br />36 The lump sum Contract price for Video Detection System ____, shall be full pay for the <br />37 construction of the complete video detection system as described above and as shown in <br />38 the Plans, and herein specified, including complete installation of owner furnished <br />39 materials to provide a fully functioning video detection system at the location described. <br />40 The Contract price shall include restoring facilities destroyed or damaged during <br />41 construction, salvaging existing materials, and for making all required tests. All additional <br />42 materials and labor, not shown in the Plans or called for herein and which are required to <br />43 complete the video detection system, shall be included in the lump sum Contract price. <br />44 Removal and salvage of existing materials associated with the construction not shown in <br />45 the Plans or called for herein and which are required to complete the video detection <br />46 system, shall be included in the lump sum Contract price. <br />47 <br />48
The URL can be used to link to this page
Your browser does not support the video tag.