My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 42 March 10, 2026 <br /> <br />A noise variance for early start has been obtained on behalf of the Contractor. The 1 <br />early start time to begin traffic control only shall be requested and approved by the 2 <br />Engineer at the preconstruction conference. The Engineer has the right to disallow the 3 <br />early start if the Contractor performs other work than traffic control setup. All mitigation 4 <br />measures stated in the contract and appendix shall be adhered to. 5 <br /> 6 <br />Summit Ave – 19th St to E Marine View Dr 7 <br />No lane closures or single lane alternating flagging operation will be permitted between 8 <br />10:00pm and 7:00am. The contractor has been granted a 1 hour early start from 9 <br />6:00am to 7:00am for traffic control setup only. Casting adjustments shall not be 10 <br />permitted between 9:00pm and 8:00am. 11 <br /> 12 <br />A noise variance for early start has been obtained on behalf of the Contractor. The 13 <br />early start time to begin traffic control only shall be requested and approved by the 14 <br />Engineer at the preconstruction conference. The Engineer has the right to disallow the 15 <br />early start if the Contractor performs other work than traffic control setup. All mitigation 16 <br />measures stated in the contract and appendix shall be adhered to. 17 <br /> 18 <br />Grandview Ave – Federal Ave to E Mukilteo Blvd 19 <br />No closures will be permitted between 10:00pm and 7:00am. A detour shall be in place 20 <br />for all work between 7:00am and 7:00pm and shall not occur concurrently with the 21 <br />detour of Elk Hill Dr or E Mukilteo Blvd. 22 <br /> 23 <br />Casting adjustments shall not be permitted between 9:00pm to 8:00am. 24 <br /> 25 <br />A noise variance for early start has been obtained on behalf of the Contractor. The 26 <br />early start time to begin traffic control only shall be requested and approved by the 27 <br />Engineer at the preconstruction conference. The Engineer has the right to disallow the 28 <br />early start if the Contractor performs other work than traffic control setup. All mitigation 29 <br />measures stated in the contract and appendix shall be adhered to. 30 <br /> 31 <br />Elk Hill Dr – 4315 to E Mukilteo Blvd 32 <br />No closures will be permitted between 10:00pm and 7:00am. A detour shall be in place 33 <br />for all work between 7:00am and 7:00pm and shall not occur concurrently with the 34 <br />detour of Grandview Ave or E Mukilteo Blvd. 35 <br /> 36 <br />Casting adjustments shall not be permitted between 9:00pm to 8:00am. 37 <br /> 38 <br />A noise variance for early start has been obtained on behalf of the Contractor. The 39 <br />early start time to begin traffic control only shall be requested and approved by the 40 <br />Engineer at the preconstruction conference. The Engineer has the right to disallow the 41 <br />early start if the Contractor performs other work than traffic control setup. All mitigation 42 <br />measures stated in the contract and appendix shall be adhered to. 43 <br /> 44 <br />Friday Ave – 41st St to Clinton Pl 45 <br />No lane closures or single lane alternating flagging operation will be permitted between 46 <br />10:00pm and 7:00am. The contractor has been granted a 1 hour early start from 47 <br />6:00am to 7:00am for traffic control setup only. Casting adjustments shall not be 48 <br />permitted between 9:00pm and 8:00am. 49 <br /> 50 <br />A noise variance for early start has been obtained on behalf of the Contractor. The 51 <br />early start time to begin traffic control only shall be requested and approved by the 52
The URL can be used to link to this page
Your browser does not support the video tag.