My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 50 March 5, 2026 <br />1 The Contractor may use up to 20 percent RAP by total weight of HMA with no additional <br />2 sampling or testing of the RAP. <br />3 <br />4 If the Contractor wishes to utilize High RAP/Any RAS, the design must be listed on the <br />5 WSDOT Qualified Products List (QPL). <br />6 <br />7 The grade of asphalt binder shall be as required by the Contract. Blending of asphalt <br />8 binder from different sources is not permitted. <br />9 <br />10 The Contractor may only use warm mix asphalt (WMA) processes in the production of <br />11 HMA with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to <br />12 the Engineer for approval the process that is proposed and how it will be used in the <br />13 manufacture of HMA. <br />14 <br />15 Production of aggregates shall comply with the requirements of Section 3-01. <br />16 Preparation of stockpile site, the stockpiling of aggregates, and the removal of aggregates <br />17 from stockpiles shall comply with the requirements of Section 3-02. <br />18 <br />19 5-04.2(1) How to Get an HMA Mix Design on the QPL <br />20 If the Contractor wishes to submit a mix design for inclusion in the Qualified Products List <br />21 (QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1). <br />22 <br />23 5-04.2(1)A Vacant <br />24 <br />25 5-04.2(2) Mix Design - Obtaining Project Approval <br />26 No paving shall begin prior to the approval of the mix design by the Engineer. <br />27 <br />28 Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA in <br />29 the Contract documents. <br />30 <br />31 Commercial evaluation will be used for Commercial HMA and for other classes of HMA <br />32 in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, <br />33 gores, prelevel, temporary pavement, and pavement repair. Other nonstructural <br />34 applications of HMA accepted by commercial evaluation shall be as approved by the <br />35 Project Engineer. Sampling and testing of HMA accepted by commercial evaluation will <br />36 be at the option of the Project Engineer. The Proposal quantity of HMA that is accepted <br />37 by commercial evaluation will be excluded from the quantities used in the determination of <br />38 nonstatistical evaluation. <br />39 <br />40 Nonstatistical Mix Design. Fifteen days prior to the first day of paving the Contractor <br />41 shall provide one of the following mix design verification certifications for Contracting <br />42 Agency review; <br />43 <br />44 •The WSDOT Mix Design Evaluation Report from the current WSDOT QPL, or one <br />45 of the mix design verification certifications listed below. <br />46 •The proposed HMA mix design on WSDOT Form 350-042 with the seal and <br />47 certification (stamp & signature) of a valid licensed Washington State Professional <br />48 Engineer. * (see below)
The URL can be used to link to this page
Your browser does not support the video tag.