My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 61 March 5, 2026 <br />1 5-04.3(9)B Vacant <br />2 <br />3 5-04.3(9)C Mixture Acceptance Nonstatistical Evaluation <br />4 HMA mixture which is accepted by Nonstatistical Evaluation will be evaluated by the <br />5 Contracting Agency by dividing the HMA tonnage into lots. <br />6 <br />7 5-04.3(9)C1 Mixture Nonstatistical Evaluation Lots and Sublots <br />8 A lot is represented by randomly selected samples of the same mix design that will be <br />9 tested for acceptance. A lot is defined as the total quantity of material or work produced <br />10 for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be <br />11 equal to one days production or 800 tons, whichever is less except that the final sublot <br />12 will be a minimum of 400 tons and may be increased to 1200 tons. <br />13 <br />14 All of the test results obtained from the acceptance samples from a given lot shall be <br />15 evaluated collectively. If the Contractor requests a change to the JMF that is approved, <br />16 the material produced after the change will be evaluated on the basis of the new JMF for <br />17 the remaining sublots in the current lot and for acceptance of subsequent lots. For a lot in <br />18 progress with a CPF less than 0.75, a new lot will begin at the Contractors request after <br />19 the Engineer is satisfied that material conforming to the Specifications can be produced. <br />20 <br />21 Sampling and testing for evaluation shall be performed on the frequency of one sample <br />22 per sublot. <br />23 <br />24 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling <br />25 Samples for acceptance testing shall be obtained by the Contractor when ordered by the <br />26 Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer <br />27 and in accordance with AASHTO T 168. A minimum of three samples should be taken for <br />28 each class of HMA placed on a project. If used in a structural application, at least one of <br />29 the three samples shall be tested. <br />30 <br />31 Sampling and testing HMA in a structural application where quantities are less than 400 <br />32 tons is at the discretion of the Engineer. <br />33 <br />34 For HMA used in a structural application and with a total project quantity less than 800 <br />35 tons but more than 400 tons, a minimum of one acceptance test shall be performed. In all <br />36 cases, a minimum of 3 samples will be obtained at the point of acceptance, a minimum of <br />37 one of the three samples will be tested for conformance to the JMF: <br />38 <br />39 •If the test results are found to be within specification requirements, additional <br />40 testing will be at the Engineers discretion. <br />41 <br />42 •If test results are found not to be within specification requirements, additional <br />43 testing of the remaining samples to determine a CPF shall be performed. <br />44
The URL can be used to link to this page
Your browser does not support the video tag.