Laserfiche WebLink
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 75 March 10, 2026 <br /> <br />sequencing of the personnel operating the types of equipment. Discuss the 1 <br />continuance of operator personnel for each type of equipment as it relates to 2 <br />meeting Specification requirements. 3 <br /> 4 <br />c. Number of JMFs to be placed, and if more than one JMF is used, how the 5 <br />Contractor will ensure different JMFs are distinguished, how pavers and how 6 <br />MTVs are distinguished, and how pavers and MTVs are cleaned so that one 7 <br />JMF does not adversely influence the other JMF. 8 <br /> 9 <br />d. Description of contingency plans for that day’s operations such as equipment 10 <br />breakdown, rain out, and supplier shutdown of operations. 11 <br /> 12 <br />e. Number of sublots to be placed, sequencing of density testing, and other 13 <br />sampling and testing. 14 <br /> 15 <br />5-04.3(15) Sealing Pavement Surfaces 16 <br />Apply a fog seal where shown in the plans. Construct the fog seal in accordance with 17 <br />Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to 18 <br />opening to traffic. 19 <br /> 20 <br />5-04.3(16) HMA Road Approaches 21 <br />Construct HMA approaches at the locations shown in the Plans or where staked by the 22 <br />Engineer, in accordance with Section 5-04. 23 <br /> 24 <br />5-04.4 Measurement 25 <br />HMA Cl. ___ PG ___, HMA for ___ Cl. ___ PG ___, and Commercial HMA will 26 <br />be measured by the ton in accordance with Section 1-09.2, with no deduction being 27 <br />made for the weight of asphalt binder, mineral filler, or any other component of the 28 <br />mixture. If the Contractor elects to remove and replace mix as allowed by Section 5-29 <br />04.3(11), the material removed will not be measured. 30 <br /> 31 <br />Roadway cores will be measured per each for the number of cores taken. 32 <br /> 33 <br />Pavement repair excavation will be measured by the square yard of surface marked prior 34 <br />to excavation. 35 <br /> 36 <br />Planing bituminous pavement will be measured by the square yard. 37 <br /> 38 <br />5-04.5 Payment 39 <br />Payment will be made for each of the following Bid items that are included in the 40 <br />Proposal: 41 <br /> 42 <br />5-04.5 Payment 43 <br />Payment will be made for each of the following Bid items that are included in the 44 <br />Proposal: 45 <br /> 46