My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 77 March 5, 2026 <br />1 <br />2 <br />3 DIVISION7.GR7 <br />4 Division 7 <br />5 Drainage Structures, Storm Sewers, Sanitary <br />6 Sewers, Water Mains, and Conduits <br />7 <br />8 7-05.docx <br />9 Manholes, Inlets, Catch Basins, and Drywells <br />10 <br />11 7-05.3.docx <br />12 Construction Requirements <br />13 <br />14 GLF 7-05.3(1).docx <br />15 Adjusting Manholes and Catch Basins to Grade <br />16 <br />17 Section 7-05.3(1) of the standard specifications is deleted and replaced with the following: <br />18 <br />19 (******) <br />20 In most work locations, planing depth is equal to overlay depth. Therefore, significant <br />21 iron adjustment is not anticipated, and adjustment of structures to grade shall occur <br />22 only as needed and/or directed by the engineer. <br />23 <br />24 Manholes, catch basins, and other structures shall not be adjusted to grade until the <br />25 pavement is completed, at which time the center of each structure shall be carefully <br />26 relocated from references previously established by the Contractor. The structure <br />27 shall then be brought to proper grade as follows: <br />28 <br />29 1. The existing cast iron ring and cover on manholes and existing cast iron frame <br />30 and grates for catch basins and inlets shall be removed and thoroughly <br />31 cleaned before reinstalling at the new elevation. <br />32 <br />33 2. The asphalt concrete pavement shall be cut and removed to a new circle, the <br />34 diameter of which shall be equal to the outside diameter of the cast iron frame <br />35 plus 2. <br />36 <br />37 3. The roadway surface materials and crushed rocks shall be removed so the <br />38 structure casting can be adjusted to the finished road grade elevation. <br />39 <br />40 4. The cast iron frame shall be placed on concrete blocks and wedged up to the <br />41 desired grade with plastic wedges. <br />42 <br />43 5. The edges of the asphalt concrete pavement and the outer edge of the <br />44 castings shall be painted with tack and HMA Class ‰ PG 64-22 shall be <br />45 placed and compacted in layers to a minimum of 91% of the maximum <br />46 theoretical density of the HMA. <br />47 <br />48 The completed patch shall match the existing paved surface for texture, density, and <br />49 uniformity of grade. The joint between the patch and the existing pavement shall
The URL can be used to link to this page
Your browser does not support the video tag.