My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 7 <br />kimley-horn.com 2828 Colby Avenue, Suite 200 Everett, WA 98201 425-708-8275 <br />l Draft Strategic Communication and Outreach Plan (SCOP) – Electronic (PDF) <br />l Final SCOP – Electronic (PDF) <br />l Public open house presentation materials and graphics – Electronic (PDF) <br />l Public comment summary – Electronic (PDF) <br />Task 1.03: Survey and Base Mapping <br />Kimley-Horn, under the direct supervision of a Washington-licensed Professional Land Surveyor <br />(PLS), will manage survey and base mapping activities in support of the project. Field survey <br />and Underground Utility Locate services will be performed by S&F and APS under the direction <br />of Kimley-Horn’s PLS. Survey data will be collected to support design development, <br />environmental documentation, and preparation of construction documents <br />The Topographic Survey shall include: <br />·Horizontal datum and Vertical datum will be per the City of Everett Municipal Code. <br />·Ground elevations within the mapping area on an approximate 25’ grid plus elevations <br />along obvious topographic breaks sufficient to prepare a map at 1’ contour intervals. <br />·Survey of the property boundaries based on a current title report or deed to be supplied <br />by the City. The survey will be performed under generally accepted survey practices and <br />is a professional interpretation of this information. <br />·Mapping of the right-of-way improvements of North Broadway within the mapping limits. <br />·A diligent review of monuments and other physical evidence that could affect the <br />location of the boundaries. <br />·Graphic depiction or notation of easements and road/street right-of-way affecting the <br />subject parcel as disclosed by the Title Commitment. <br />·Establishment of two site benchmarks based on reference to the nearest controlling <br />benchmark and datum. <br />·Existing on-site structures and those within 25’ of the depicted boundary on adjoining <br />parcels. <br />·Location of individual trees per City of Everett standards at diameter at breast height <br />(DBH). <br />·Planimetric features including but not limited to buildings, driveways, walls, curbs, fences <br />and other significant physical features will be collected within the limits of survey. <br />·Location of visible surface evidence of the various utility systems, such as utility poles, <br />manholes, inlets, catch basins, culverts, valves, fire hydrants, and other visible utility <br />surface features. <br />·Information shown on utility records that are available at the time of the survey shall be <br />incorporated into the survey. The location of each main, pipe, conduit line and other <br />structures will be indicated based upon safely observable evidence. <br />·The services of a private utility locate service to place markings for underground utilities. <br />The scope and fee provided for this task consist of one surveyor site mobilization to obtain <br />required field data and does not include additional surveyor mobilizations. Revisions to the <br />design survey based on revisions to the Title Commitment, legal review or additional <br />mobilizations will be considered an additional service.
The URL can be used to link to this page
Your browser does not support the video tag.