Laserfiche WebLink
Mr. Andy West <br />February 12, 2026 <br />Page 2 <br /> <br /> <br /> <br />PHASE 1B <br /> <br />Refer to table below for anticipated civil deliverables for the Design Document (DD) and <br />Construction Document (CD) phases of the project. <br /> <br /> PHASE 1A <br />(Complete) PHASE 1B <br /> SD+ DD/GMP CD Subsequent <br />Permit Packages <br />PLAN SHEETS <br />Notes/Cover Sheet ♦ ♦ ♦ <br />Construction Baseline Plan ♦ ♦ <br />Temporary Erosion and <br />Sediment Control (TESC) <br />Plans <br />♦ ♦ ♦ <br />TESC Details ♦ ♦ <br />Site Demolition Plans ♦ ♦ ♦ <br />Site Demolition Details ♦ <br />Foundation Drainage Plans ♦ ♦ <br />Site Utility and Storm <br />Drainage Plans ♦ ♦ ♦ ♦ <br />Site Utility and Storm <br />Drainage Profiles and <br />Details <br /> ♦ ♦ ♦ <br />SnoPUD Reroute Plans ♦ ♦ ♦ ♦ <br />SnoPUD Reroute Profile ♦ ♦ <br />Paving and Grading Plans ♦ ♦ ♦ ♦ <br />Grading Details and <br />Enlargements ♦ ♦ <br />Paving Details ♦ ♦ ♦ ♦ <br />SUPPORTING <br />DOCUMENTS <br />Storm Drainage Report ♦ ♦ ♦ <br />Civil Design Narrative ♦ <br />Specifications ♦ ♦ ♦ <br />Utility Reroute Exhibit <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal