My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 3 <br /> <br /> <br />• (1) Owner Training Coordination Meeting <br />• (1) Construction Phase Commissioning Kick-Off meeting <br />• (Monthly) Commissioning progress / Team Collaboration meetings <br />• (1) Construction Phase Controls meeting <br />• (6) Construction observation site visits <br />• (6) Functional testing site visits <br />Occupancy Phase: <br />1. Prepare and maintain a Current Facilities Requirements and Operations and Maintenance Plan that <br />contains the information necessary to operate the building efficiently. <br />2. Provide a final commissioning report including an executive summary, brief description, overview of <br />testing scope and a general description of testing and verification methods, along with a summary of <br />the process used. Each non-compliance issue shall be referenced to the specific functional test, trend <br />log, etc. where the deficiency is documented. <br />3. Participate in the following meetings site visits during the occupancy phase: <br />• (1) Project closeout meeting <br />LEED BD+C: New Construction – Energy & Atmosphere – Enhanced Systems Commissioning (3-4 Points) <br />Path 1: Enhanced Commissioning: <br />Design Phase: <br />1. Verify inclusion of systems manual requirements in construction documents. <br />2. Verify inclusion of operator and occupant training requirements in construction documents. <br />3. Participate in the following meetings and site visits during the design phase: <br />• (3) Additional Design Review Meetings <br />Construction Phase: <br />1. Review contractor submittals for testability of ventilation equipment, temperature controls, <br />and other water and air flow control devices. <br />2. Verify systems manual updates and delivery to include BOD, one-line diagrams, control <br />sequences, and O&M manuals. <br />3. Verify operator and occupant training delivery and effectiveness. <br />4. Develop an on-going commissioning plan to include facility requirements and maintenance <br />plans. <br />Occupancy Phase: <br />1. Verify seasonal testing of systems that require testing under design conditions (e.g. heating <br />system in winter) <br />2. Review building operations 10 months after substantial completion. <br />3. Participate in the following meetings and site visits during the occupancy phase <br />• (2) Seasonal functional testing site visits <br />• (2) Training sessions with contractors and facility personnel. <br />• (2) Warranty Walk site visits <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.