My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Outdoor Event Center – Phase 1B <br />January 6, 2026 <br />Page 5 of 9 <br /> Irrigation plans and Details <br /> Planting Plans and Details <br /> Site Construction Details <br /> Specifications in CSI format <br />3.7 Produce and submit 100% CD Set. <br />3.8 Deliverables at 100% CD: <br /> Tree Protection Plans <br /> Layout Plans (north and south entrance plazas, pedestrian circulation). <br /> Site Materials Plans <br /> Soil Preparation Plans <br /> Irrigation Plans and Details <br /> Planting Plans and Details <br /> Site Construction Details <br /> Specifications in CSI format <br />3.9 Total meeting attendance for Construction Document phase: <br /> Up to twenty-four (24) coordination meetings with consultant team, contractor, and client <br />(virtual). <br />4. Construction Permits – Concurrent with Tasks 3 and 5 <br />4.1 Produce and submit final stamped and signed documents to DLR Group as required for <br />permitting. <br />4.2 The construction permits currently anticipated for this project are: <br /> Demolition (Walker Macy will provide Tree Protection Plans) <br /> Commercial Building Permit (Walker Macy will provide full plan set, based on 100% <br />Construction Documents) <br /> Other Permits (including Electrical, Mechanical, Public Works, Franchise Utility, Water <br />Sewer Utility) that do not require Walker Macy involvement. <br />4.3 Provide support graphics or documentation for permits prepared and submitted by others. <br />4.4 Respond to permit comments, revise drawings, and resubmit to DLR Group as required. <br />5. Phase 2: Bidding Support – August 2026 <br />Not included. <br />6. Phase 2: Services During Construction – August 2026 to September 2027 <br />Not included. <br />7. Phase 2: Project Close-Out – September 2027 <br />Not included. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.