My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT SUMMARY <br />Bayley Construction (WA) / MiLB: Everett Aqua Sox Ballpark <br />DLR Group will provide the following: <br />The XGD Studio at DLR Group will develop and produce wayfinding + signage design for the Everett Aqua Sox Ballpark in <br />Everett, Washington. DLR Group will provide a bid package that will be supplied to a fabricator to be used for bidding and as <br />their basis of design. Selected fabricator will be responsible for creating their own shop drawings to build from. <br />DLR Group will provide three (3) initial design concepts for consideration. Three (3) rounds of revisions for the selected <br />design option are included in our estimate. Requested revisions that are greater than the three (3) stated rounds will <br />potentially be considered additional services and billed at an hourly rate of $235. <br />Project Deliverables: <br />• DLR Group will create three (3) design options. <br />• DLR Group will provide a bid package for fabricators to provide pricing. <br />• DLR Group will review fabricator shop drawings, samples, and attend an on-site punch list after install in complete. <br />Design Services: <br />Any mutually-agreed Additional or Supplemental Services beyond the scope of the specific Basic Services will be performed <br />upon written notice from the Owner. Additional Services will be compensated on the basis of the hourly rates of all <br />personnel engaged on the Project, plus Reimbursable Charges as defined under Compensation. <br />Potential Sign Types + Experiential Graphics Locations: <br />Based on our studio’s historical data these are the potential sign types that will need to be addressed for this current <br />design exercise. <br /> <br />MILB: EVERETT AQUA SOX BALLPARK WAYFINDING + SIGNAGE DESIGN PROPOSAL <br />1. ADA Room ID (FoH / BoH) <br />2. Amenity ID <br />3. Area of Refuge ID <br />4. Banners <br />5. Bike Storage <br />6. Building Address (TBD) <br />7. Leasing Office ID <br />8. Conference Room ID <br />9. Dimensional Letters (P / S) <br />10. Directional (L / M / S) <br />11. Directory (building / level) <br />12. Elevator Egress <br />13. Emergency Phone <br />14. Fire Extinguisher & Defibrillator <br />15. Fitness Center Rules <br />16. Freight Lobby and After-hours <br />17. Identification Blade <br />18. Information Signage on Millwork <br />19. Informational Symbols <br />20. Interior Stairwell ID <br />21. Loading Dock <br />22. Mail Services <br />23. Maximum Occupancy <br />24. No Smoking Notification <br />25. Office ID w/ Insert (L / S) <br />26. Pool Rules <br />27. Residence Unit ID <br />28. Restroom ID (FoH / BoH) <br />29. Retail Signage <br />30. Security Restricted Area <br />31. Stair ID (FoH / BoH) <br />32. Stair Level ID <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.