My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />January 9, 2026 <br />Page 7 of 10 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />PHASE 2 SCOPE CA Person <br />Days <br />on Site <br />Bowl Sound/AV/TV Systems $13,000 2 <br />LED Display System $4,500 1 <br />In-House Video Production $8,500 1 <br />Broadcast Cabling $2,500 1 <br />Acoustics/Noise Control $496 0 <br />Structured Cabling System $7,500 1 <br />Surveillance & Access Control $5,000 1 <br />TOTALS $41,496 7 <br />WJHW’s fees assume that all services shall be accepted as part of this proposal. WJHW reserves the <br />right to renegotiate our fee estimates should the project’s final program, design direction and scope <br />differ from what is outlined above. <br />PROJECT MEETINGS <br />We anticipate participating in video or phone conferences for most coordination meetings <br />associated with the project as we do not foresee our in-person attendance will be required at all <br />meetings and presentations. We request that we only be asked to participate in those meetings when <br />our scope of efforts is being discussed or our technical expertise is required. <br />PROJECT-RELATED REIMBURSABLE EXPENSES <br />Project-related reimbursable expenses are considered to include, but are not limited to, non-stop, <br />coach airfare travel and fees, lodging, mileage at prevailing IRS rates, rental car, meals while traveling, <br />printing, expedited delivery, etc. and are invoiced in addition to our professional fees. Any penalty or fee <br />which is imposed on us by any common carrier or hotelier as a result of itinerary changes that are <br />necessitated by a meeting schedule which is changed by Owner/design team will be invoiced as a <br />reimbursable expense. <br />EXCLUSIONS <br />The following services are not a part of our basic services but can be addressed in an addendum to <br />this proposal if deemed necessary: <br />· Detailed functional drawings and specifications during the CD phase. We anticipate the <br />design-build contractor to provide the balance of the design. <br />· Documenting design-build contractor changes after 100% CD. <br />· Design of LED display system. <br />· Design of TV Truck parking, connectivity and cabling. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.