My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />January 9, 2026 <br />Page 8 of 10 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· Division 8 Door Hardware <br />· Concert/Stage rigging and lighting <br />· Environmental Noise Assessment <br />· Network Electronics design and specifications (switches, phones, Wi-Fi APs, printer, etc.) <br />· Point of Sale Systems, JWO/AIFI/AR retail systems <br />· Security screening equipment and ticketing devices <br />· Fire Alarm and Life Safety System design or intelligibility review. <br />· Distributed Antenna System (DAS) for consumer carriers and public safety (ERRC) <br />· Video Coaching, Analytics, Player Tracking and Medical Equipment Design <br />· Television and Bracket Schedule <br />· On-Site Project Management <br />· Post Occupancy review, testing and report, Two-year warranty inspections. <br />· Additional acceptance testing or systems adjustment to accommodate changes in the <br />design that are beyond the control of WJHW. <br />· Any LEED/Green Certification paperwork preparation and submission. <br />· Preparation of record documents that include contractor markups. <br />BIM DOCUMENTATION <br />WJHW has the capability of preparing our documents in Revit for the design development and <br />construction document phases as directed. If utilizing Revit, models will be produced up to a Level of <br />Development (LOD) of 300 during the construction document phase. Elements and details not modeled <br />under an LOD of 300 will be conveyed through 2D drawings. Additionally, conduits will not be modeled; <br />conduit quantity and size requirements will be annotated throughout the drawing set. <br />Our fees are based on utilizing WJHW’s CAD/BIM standards for all electronically drafted drawings <br />released by our office. Requests that we conform to another CAD/BIM standard, whether it be that of <br />Architect or some other entity, will be reviewed and discussed with whichever group holds WJHW’s <br />contract. We reserve the right to add fees necessary to cover the additional design/CAD time on <br />WJHW’s part to accommodate the requested conversion to another standard. <br />We have assumed that we will be working from no more than five models. Accessing and working with <br />more will necessitate the need for additional services. <br />Drawings and specifications are understood to be sent electronically/posted (on an FTP site) for <br />printing and distribution by the Owner or Architect. <br /> <br />OTHER PROJECT PROVISIONS <br />STANDARD OF CARE: WJHW will endeavor to perform our services in accordance with generally <br />accepted standards of practice in effect at the time of performance. WJHW owes no fiduciary <br />responsibility to any party involved in this agreement. <br />PROFESSIONAL SEAL: There is no “seal” for our design services; therefore, the contract documents <br />produced are not anticipated to be sealed by WJHW, unless we have notice of any requirement prior <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.