Laserfiche WebLink
Painting - Any & ALL, Including Mechanical surfaces, Building or Property <br /> Equipment Pads / House keeping pads, Mechanical Structures <br /> Generator Exhaust, Mufflers and Accessories <br /> Temporary Heating, Cooling, Controls, Air, Power / Electrical, Water, Gas, Propane. <br /> Fire Protection and or Suppression <br /> Fire Alarm Systems <br /> Security Systems <br /> Asbestos and All other Hazardous Materials Testing or Abatement of <br /> Mold & Mildew - Moisture Protection <br /> Overtime or Shift Work Hours ( before 6am & after 5pm M-F, Saturday, Sunday & Holidays ) <br /> Conveying Systems - Elevators, Escalators, Conveyors, Dumbwaiters <br /> Bonds and Related Fees <br /> Permits and Related Fees <br /> Washington State Sales Tax <br /> All construction costs associated with HVAC systems, ductwork, equipment, management & labor <br /> All construction costs associated with Plumbing systems, equipment, management & labor <br /> Food Service Equipment <br />Base Pricing - Phase 1B Design Cost (DD & CD)………………………….…………………………………………………338,310$ <br />Base Pricing - Phase 2 CA Cost (Construction Administration)………………………….……………………………………………73,689$ <br />Base Pricing - Total………………………….……………………………………………411,999$ <br />A written subcontract or Notice to Proceed will be required prior to the commencement of any work. <br />Clarification available upon request. <br />Sincerely, <br />Brian Pringle <br />Johansen Mechanical, Inc. <br />Project Manager / Estimator <br />Plan Spec Division <br />2 of 2 <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal