My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Painting - Any & ALL, Including Mechanical surfaces, Building or Property <br /> Equipment Pads / House keeping pads, Mechanical Structures <br /> Generator Exhaust, Mufflers and Accessories <br /> Temporary Heating, Cooling, Controls, Air, Power / Electrical, Water, Gas, Propane. <br /> Fire Protection and or Suppression <br /> Fire Alarm Systems <br /> Security Systems <br /> Asbestos and All other Hazardous Materials Testing or Abatement of <br /> Mold & Mildew - Moisture Protection <br /> Overtime or Shift Work Hours ( before 6am & after 5pm M-F, Saturday, Sunday & Holidays ) <br /> Conveying Systems - Elevators, Escalators, Conveyors, Dumbwaiters <br /> Bonds and Related Fees <br /> Permits and Related Fees <br /> Washington State Sales Tax <br /> All construction costs associated with HVAC systems, ductwork, equipment, management & labor <br /> All construction costs associated with Plumbing systems, equipment, management & labor <br /> Food Service Equipment <br />Base Pricing - Phase 1B Design Cost (DD & CD)………………………….…………………………………………………338,310$ <br />Base Pricing - Phase 2 CA Cost (Construction Administration)………………………….……………………………………………73,689$ <br />Base Pricing - Total………………………….……………………………………………411,999$ <br />A written subcontract or Notice to Proceed will be required prior to the commencement of any work. <br />Clarification available upon request. <br />Sincerely, <br />Brian Pringle <br />Johansen Mechanical, Inc. <br />Project Manager / Estimator <br />Plan Spec Division <br />2 of 2 <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.