Laserfiche WebLink
<br /> <br />March 6, 2026 <br /> <br /> <br /> <br />Brian Pringle <br />Project Manager/Estimator <br />Johansen Mechanical, Inc. <br />16372 177th Ave S <br />Monroe, WA 98272 <br /> <br /> <br /> <br />Project: Everett Multipurpose Stadium <br /> Everett, WA <br /> <br />Subject: Fee Proposal – Professional Engineering Services <br /> <br /> <br />Dear Brian: <br /> <br />Thank you for the opportunity to provide you our proposal for the referenced project. We <br />will provide our engineering services for continuation of the completed Schematic Phase <br />that was delivered in November 7, 2025, and in accordance with the following. <br /> <br />PROJECT DESCRIPTION <br /> <br />Project Owner <br />City of Everett <br /> <br />Project Location <br />Everett, WA <br /> <br />Building / Project Description <br />Everett Multipurpose Stadium is a multipurpose stadium that will house the Everett <br />AquaSox and host community events. The stadium includes a 253,136 SF (not enclosed) <br />area with 72,185 GSF (enclosed) space. The space will include Spectator Seating, <br />Spectator Facilities, Food & Retail Facilities, Media Facilities, Administration Facilities, <br />Team/Event Facilities, Team/Event Facilities, Playing Field Facilities, Service & Operations <br />Facilities and Sound System & Scoreboard. <br /> <br />CONSTRUCTION COSTS <br /> <br />Based on information we received the preliminary estimate is: <br />A. Total Construction Cost: $50,000,000 (Estimate) <br /> <br />INFORMATION SOURCE <br /> <br />Proposal is based on the following correspondence: <br />A. Email from Keith Johansen dated April 28, 2025. <br />B. Email with four attachments from Brian Pringle dated April 28, 2025. <br />Needs To Be Edited <br />Select An Option <br />Informational – Needs to Be Deleted <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal