My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 <br />Everett Multipurpose Stadium <br />March 6, 2026 <br /> <br /> <br />PROJECT SCHEDULE <br /> <br />A. Design and Documentation: TBD. <br />B. Construction: TBD. <br /> <br />ASSUMPTIONS <br /> <br />Based on information received, we understand that this project: <br />A. Will have a single bid / construction packet. <br />B. Limited to HVAC and Plumbing engineering only. <br /> <br />DESIGN SUBMITTALS <br /> <br />Design Development <br />Construction Documents <br />Permit <br /> <br />MEETINGS <br /> <br />Meetings with design team, Owner representative, and construction team during design <br />phase and construction. <br />A. Up to twenty-one (21) mechanical meetings attended by up to two (2) staff members. <br />B. Up to twenty-one (21) plumbing meetings attended by up to two (2) staff members. <br /> <br />SUMMARY: BASE SERVICES <br /> <br />A. Mechanical Engineering Services <br />1. Heating, ventilation, and air conditioning <br />2. Plumbing <br /> <br />ENGINEERING SERVICES DESCRIPTION <br /> <br />Our scope of services is limited to the following. Services not included are Additional <br />Services. <br /> <br />A. Mechanical Engineering Services <br />1. Heating, Ventilation, and Air Conditioning Systems Design: <br />a. Air conditioning and heating systems design. <br />b. Space heating and ventilation design for areas not requiring air conditioning. <br />c. Heating and cooling load calculations, energy profile. <br />d. General building exhaust systems design including toilet rooms . <br /> <br />2. Plumbing Systems Design: <br />a. Sanitary drainage, vent, and piping design to five feet outside building. <br />b. Domestic cold and hot water piping distribution; cold water to five feet <br />outside building. <br />c. Domestic water heating system. <br />d. Storm water drainage piping to five feet outside building. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.