Laserfiche WebLink
Page 2 <br />Everett Multipurpose Stadium <br />March 6, 2026 <br /> <br /> <br />PROJECT SCHEDULE <br /> <br />A. Design and Documentation: TBD. <br />B. Construction: TBD. <br /> <br />ASSUMPTIONS <br /> <br />Based on information received, we understand that this project: <br />A. Will have a single bid / construction packet. <br />B. Limited to HVAC and Plumbing engineering only. <br /> <br />DESIGN SUBMITTALS <br /> <br />Design Development <br />Construction Documents <br />Permit <br /> <br />MEETINGS <br /> <br />Meetings with design team, Owner representative, and construction team during design <br />phase and construction. <br />A. Up to twenty-one (21) mechanical meetings attended by up to two (2) staff members. <br />B. Up to twenty-one (21) plumbing meetings attended by up to two (2) staff members. <br /> <br />SUMMARY: BASE SERVICES <br /> <br />A. Mechanical Engineering Services <br />1. Heating, ventilation, and air conditioning <br />2. Plumbing <br /> <br />ENGINEERING SERVICES DESCRIPTION <br /> <br />Our scope of services is limited to the following. Services not included are Additional <br />Services. <br /> <br />A. Mechanical Engineering Services <br />1. Heating, Ventilation, and Air Conditioning Systems Design: <br />a. Air conditioning and heating systems design. <br />b. Space heating and ventilation design for areas not requiring air conditioning. <br />c. Heating and cooling load calculations, energy profile. <br />d. General building exhaust systems design including toilet rooms . <br /> <br />2. Plumbing Systems Design: <br />a. Sanitary drainage, vent, and piping design to five feet outside building. <br />b. Domestic cold and hot water piping distribution; cold water to five feet <br />outside building. <br />c. Domestic water heating system. <br />d. Storm water drainage piping to five feet outside building. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal