My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 3 <br />Everett Multipurpose Stadium <br />March 6, 2026 <br /> <br /> <br />e. Gas piping to utility provided meter. <br />f. Plumbing fixture specifications and cut sheets. <br />g. Connections to Noncommercial kitchen equipment based on information <br />provided by Owner. <br />h. Connections for equipment and appliances provided by others; connection <br />requirements to be based on information provided by others. <br /> <br />CONSTRUCTION ADMINISTRATION: BIDDING AND NEGOTIATIONS <br /> <br />A. Answer questions during bidding phase. <br />B. Issue addenda as may be required under the original design scope. <br />C. Review of the HVAC and Plumbing system submittals. <br />D. Answer RFIs, DCVRs, and construction questions. <br />E. Construction observation includes five (5) site visits for mechanical and plumbing <br />systems. <br />F. Preparation of construction record drawings from Contractor’s field drawings. <br /> <br />EXCLUSIONS AND CLARIFICATIONS <br /> <br />A. Commercial Kitchen exhaust and make-up air systems design are not included. <br />B. Review of change order costs initiated by others are not included. <br />C. Construction cost estimates will be by construction cost estimator. We will provide a <br />cost opinion only. <br />D. Pre-bid and pre-construction meetings are not included. <br />E. Life cycle cost analysis for alternate mechanical / electrical systems are not included. <br />F. Structural calculations for the seismic restraint of mechanical equipment is not <br />included. <br />G. Waterproofing details / requirements for building components by others are not <br />included. <br />H. Commissioning of systems is not included. <br />I. Cost reduction requiring redesign after approved systems have been designed is not <br />included. <br />J. Change order issues, ASIs, and revisions requiring redesign and additional design are <br />not included. <br />K. Acoustical calculations for systems are not included. We will design our systems per <br />your acoustical consultants’ recommendations. <br />L. Design of building footing drainage and/or sub-slab groundwater drainage is by <br />others. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.