My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />November 17, 2025 <br /> <br />Bayley Construction <br />8005 SE 28th Street <br />Mercer Island, WA 98040 <br /> <br />Attn: Stewart Potter <br />Subject: AquaSox Stadium Electrical Engineering Proposal <br /> <br />Stewart, <br />We are pleased to present our phase 1B proposal for design, preconstruction and engineering to <br />complete the DD, CD and support the Construction Administration. <br /> <br />Cochran understands some of the scopes will be designed by others and is not included in our <br />scope of work. Civil electrical work, building and field lighting will be in Cochran’s scope. In <br />addition, all low voltage systems will be designed by WJHW. <br /> <br />We look forward to working with you on the development of the AquaSox Stadium. <br /> <br /> <br />Sincerely, <br /> <br />Jerod Gummer <br />Director of Large Construction <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.