Laserfiche WebLink
AquaSox Stadium Electrical Design and Preconstruction 2 <br /> <br /> <br /> <br />100% DD to 100% CD's 11/24/2025 thru 4/17/2026 20.6 Weeks <br />Rate Hrs./Week Weeks Total Hrs. Total <br />Meetings 140$ 4.00 20.6 82.29 11,520$ <br />Assist in Design / Coordination 140$ 4.00 20.6 82.29 11,520$ <br />Assist in Design / Coordination 135$ 1.00 20.6 20.57 2,777$ <br />Prefabrication Coordination 135$ 2.00 20.6 41.14 5,554$ <br />Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ <br />Administrative Work 55$ 2.00 20.6 41.14 2,263$ <br />BIM Coordination (100% DD to 100% CD) 135$ 20.00 20.6 411.43 55,543$ <br />Chief Estimator 105$ 20 2,100$ <br />Senior Estimator 75$ 40 3,000$ <br />Estimator 60$ 40 2,400$ <br />Chief Estimator 105$ 30 3,150$ <br />Senior Estimator 75$ 30 2,250$ <br />Estimator 60$ 60 3,600$ <br />169,400$ <br />280,477$ <br />Fee 10.0%28,048$ <br />B&O 0.584%1,802$ <br />310,327$ <br />Preconstruction Phase 1B <br />GRAND TOTAL Phase 1B <br />Sub-Total <br />Project Executive/Director of Preconstruction <br />Project General Foreman <br />Project Assistant <br />Coffman Engineering DD Through CD & Construction Administration <br />BIM Team <br />50% CD Estimate <br />100% CD Estimate <br />SD Through DD Sub-Total <br />Construction Documents, VDC Coordination/Clash Detection & Construction Administration <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal