My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AquaSox Stadium Electrical Design and Preconstruction 2 <br /> <br /> <br /> <br />100% DD to 100% CD's 11/24/2025 thru 4/17/2026 20.6 Weeks <br />Rate Hrs./Week Weeks Total Hrs. Total <br />Meetings 140$ 4.00 20.6 82.29 11,520$ <br />Assist in Design / Coordination 140$ 4.00 20.6 82.29 11,520$ <br />Assist in Design / Coordination 135$ 1.00 20.6 20.57 2,777$ <br />Prefabrication Coordination 135$ 2.00 20.6 41.14 5,554$ <br />Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ <br />Administrative Work 55$ 2.00 20.6 41.14 2,263$ <br />BIM Coordination (100% DD to 100% CD) 135$ 20.00 20.6 411.43 55,543$ <br />Chief Estimator 105$ 20 2,100$ <br />Senior Estimator 75$ 40 3,000$ <br />Estimator 60$ 40 2,400$ <br />Chief Estimator 105$ 30 3,150$ <br />Senior Estimator 75$ 30 2,250$ <br />Estimator 60$ 60 3,600$ <br />169,400$ <br />280,477$ <br />Fee 10.0%28,048$ <br />B&O 0.584%1,802$ <br />310,327$ <br />Preconstruction Phase 1B <br />GRAND TOTAL Phase 1B <br />Sub-Total <br />Project Executive/Director of Preconstruction <br />Project General Foreman <br />Project Assistant <br />Coffman Engineering DD Through CD & Construction Administration <br />BIM Team <br />50% CD Estimate <br />100% CD Estimate <br />SD Through DD Sub-Total <br />Construction Documents, VDC Coordination/Clash Detection & Construction Administration <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.