Mr. Jerod Gummer <br />Cochran Electric <br />November 12, 2025 <br />Page 2 <br /> <br /> <br /> <br />of the SnoPUD owned feeders and vaults. The design of the site SnoPUD feeders, vaults, <br />poles and other utility distribution will be by the Civil Engineer. <br />3. One-line drawing showing feeder and equipment sizes, available fault current values, and <br />energy metering. <br />4. Power floor plans showing receptacles and 120V and above electrical connections for <br />equipment installed and designed by other trades such as food service, telecom, AV, and <br />other low-voltage systems. Branch circuit wiring will be shown with circuit numbers next to <br />the devices. <br />5. Lighting plans showing the lighting layouts (by others) lighting control devices (occupancy <br />sensors, switches, photocells) as well as switching and daylighting zones and branch circuit <br />wiring with circuit numbers. Emergency lighting will be noted next to egress fixtures that <br />require emergency power. <br />6. Mechanical power plans showing mechanical equipment connections with equipment <br />ratings and branch circuit wiring via circuit numbers next to the connections or in a <br />mechanical equipment schedule. <br />7. The design will be completed in a manner to achieve the agreed upon LEED points assigned <br />to the electrical discipline. Credits associated with lighting fixture selection and placement <br />will be coordinated with the lighting designer. <br />8. Coordinate with the Owner to provide connection points for broadcasting and event power. <br />9. Attend two hours of weekly design and coordination meetings throughout the design phase. <br />10. The electrical design will be produced in Revit to a LOD of 200. <br />11. Book form Division 26 specifications. <br />ASSUMPTIONS, EXCLUSIONS AND EXCEPTIONS <br />1. This proposal assumes that all electrical engineering will be completed at the same time <br />and there will be no phasing within the project scope. <br />2. Construction administration/support services are excluded from this proposal. A separate <br />fee proposal can be provided for construction administration/support services. <br />3. This proposal is based on a construction cost of no more than $55 million. <br />4. The facility will not be designed to NetZero or Living Building standards. <br />5. Specification and placement of all site, stadium, and field luminaires assumed to be by <br />others and excluded. <br />6. No generator will be required. <br />7. The lighting control system for field lighting will be designed by the field lighting designer. <br />8. Design work for duct bank routing, utility poles, utility vaults, and other infrastructure <br />associated with the electrical utility upstream of the utility transformer is assumed to be by <br />the Civil Engineer. Coffman will show general routing for reference. <br />9. Design of all low-voltage systems (telecommunications, AV, fire alarm, building controls, <br />etc.) are excluded unless specifically indicated as being provided by Coffman under the <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal