My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 3216 - 2 <br />2026 Biosolids Removal and Disposal UT 3752-30 <br /> <br />01 3216 - 2 CONSTRUCTION PROGRESS SCHEDULE <br /> <br />B. Schedule shall be submitted electronically. Acceptable format .xls, .mpp and pdf. <br />C. Review by the City or City’s Representative shall not constitute approval or <br />acceptance of the Contractor's construction means, methods, sequencing, logic, <br />order, precedence and succession of activities or Contractor’s ability to complete <br />the Work in a timely manner. <br />D. The review/approval of any schedule shall not transfer any of the Contractor’s <br />responsibilities to the City. <br />E. Subcontractors shall review all schedules prior to submittal. At the City’s option <br />and sole discretion, City may require Contractor to obtain written acceptance of <br />each schedule by subcontractors as practical and feasible, as the schedule <br />relates to subcontractors’ work. <br />1.4 UPDATES <br />A. The Project Construction Schedule will be reviewed and updated at each <br />progress meeting. All changes to the project schedule of more than three (3) <br />working days shall be documented. The Schedule shall be updated to show <br />measures required to bring project back on schedule. The Contractor alone shall <br />remain responsible for adjusting forces, equipment, and work schedules to <br />ensure completion of the work within the Contract Time. Any mistakes or errors <br />in any schedule, including, but not limited to, mistakes or errors of logic, order, <br />precedence, and duration, are and remain the Contractor's. <br />B. Should any activity not be completed by the stated scheduled date, the City will <br />have the right to require the Contractor to expedite completion of the activity by <br />whatever means appropriate and necessary, without additional compensation to <br />the Contractor. <br />C. The Schedule shall be used to justify time extension days requested by the <br />Contractor. For additional days requested, the Schedule shall be detailed <br />enough to identify the work item(s) affected and the relationship to the changed <br />or added work. <br />D. Schedule shall be provided during the construction meetings. Schedule shall be <br />on 11x17 papers and shall show current work progress. <br />END OF SECTION 01 3216
The URL can be used to link to this page
Your browser does not support the video tag.