My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 6/12/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants 6/12/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 1:36:06 PM
Creation date
6/12/2026 1:35:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
6/12/2026
Council Approval Date
6/10/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Matt Gagner
Subject / Project Title
Engineering consultant services for the WPCF DS1 Gate Replacement and SC3 Launder Repair
Tracking Number
0005270
Total Compensation
$169,488.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 4 <br />Category 2: For official use only / disclosure permissible by law. <br />Project will be completed before December 31, 2027. <br />As-needed and periodic communications with the Client will be virtual. <br />Meetings: <br />None. <br />Task 2 – Design <br />BHC will prepare drawings, specifications, and opinions of probable construction cost (OPCCs) for the <br />Project. BHC will prepare 50%, 90%, and 100% design submittals for review by the Client, address Client <br />comments on each, and produce final bid documents. <br />Work Tasks: <br />2.1 50% Design. <br />o Prepare 50% design drawings, which includes development of drawings as identified in the <br />assumptions below. <br />o Prepare 50% specifications, which includes development of a table of contents major technical <br />specifications as identified in the assumptions below. <br />o Prepare a 50% OPCC for the project. The level and accuracy of the estimate will be as <br />identified in the assumptions below. <br />o Submit the 50% Design Submittal for the project including drawings, specifications, and OPCC. <br />2.2 90% Design. <br />o Client comments on the 50% Design Submittal will be addressed and incorporated into the <br />90% Design submittal. <br />o Prepare 90% design drawings, which includes development of all remaining drawings as <br />identified in the assumptions below. <br />o Prepare 90% specifications, which includes development of all remaining specification sections <br />as identified in the assumptions below. This includes preparation of Division 00 specifications <br />by entering project specific information into the standard Division 00 specifications provided by <br />the Client. <br />o Prepare a 90% OPCC for the project by updating the 50% OPCC. The level and accuracy of <br />the estimate will be as identified in the assumptions below. <br />o Submit the 90% Design Submittal for the project including drawings, specifications, and OPCC. <br />2.3 100% Design. <br />o Client comments on the 90% Design Submittal will be addressed and incorporated into the <br />100% Design submittal. No additional drawings or specifications will be prepared. <br />o Submit the 100% Design Submittal for the project including drawings, specifications, and <br />OPCC.
The URL can be used to link to this page
Your browser does not support the video tag.