My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 6/12/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants 6/12/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 1:36:06 PM
Creation date
6/12/2026 1:35:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
6/12/2026
Council Approval Date
6/10/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Matt Gagner
Subject / Project Title
Engineering consultant services for the WPCF DS1 Gate Replacement and SC3 Launder Repair
Tracking Number
0005270
Total Compensation
$169,488.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 5 <br />Category 2: For official use only / disclosure permissible by law. <br />2.4 Final Bid Documents. <br />o Client comments on the 100% Design Submittal will be addressed and incorporated into the <br />Final Bid Documents. No additional drawings or specifications will be prepared. <br />o Submit the Final Bid Documents for the project including drawings, specifications, and OPCC. <br />Final Bid Documents will be stamped and signed by a registered professional engineer. <br />2.5 Site Visits. <br />o BHC will conduct two (2) verification site visits to review the 50% and 90% design submittals <br />and existing conditions for compatibility, conflicts, and accuracy. Each site visit will be attended <br />by two (2) team members from BHC. Site visit duration, including travel time, will be up to 6 <br />hours. <br />Receivables: <br />Client standard front-end documents in electronic format. <br />Consolidated 50% Design comments. <br />Consolidated 90% Design comments. <br />Consolidated 100% Design comments. <br />Deliverables: <br />Electronic copy of 50% Design Submittal. <br />Electronic copy of 90% Design Submittal and responses to 50% Design Client comments. <br />Electronic copy of 100% Design Submittal and responses to 90% Design Client comments. <br />Electronic copy of Final Bid Documents and responses to 100% Design Client comments. <br />Electronic copy of CAD drawing files and Word specification files. <br />Assumptions: <br />No mechanical, architectural, electrical, or instrumentation drawings will be required for the design. <br />Project specifications will utilize the 6-digit Construction Specifications Institute (CSI) format. <br />Surveying and permitting are not required and the project is exempt from the SEPA process as the <br />work is related to maintenance activities. <br />Approximately 11 drawings are expected to be included in the Bid Documents, as shown in the <br />Preliminary Drawings List below. The Preliminary Drawing List also indicates which drawings are <br />planned to be provided for each design submittal. Drawings submitted in prior submittals will be <br />updated for subsequent submittals based on Client comments received and coordination with the <br />other drawings as the design develops. <br />DWG # Drawing Name 50% 90% 100% <br />G-1 COVER SHEET AND MAPS <br />G-2 DRAWINGS INDEX, NOTES, AND PIPING SYMBOLS
The URL can be used to link to this page
Your browser does not support the video tag.