Laserfiche WebLink
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 6 <br />Category 2: For official use only / disclosure permissible by law. <br />G-3 LEGEND, ABBREVIATIONS, AND DESIGNATIONS  <br />C-1 EXISTING SITE PLAN  <br />C-2 DIVERSION STRUCTURE NO. 1 DEMOLITION PLAN <br />AND SECTIONS  <br />C-3 DIVERSION STRUCTURE NO. 1 PLAN AND <br />SECTIONS  <br />C-4 DIVERSION STRUCTURE NO. 1 DETAILS  <br />C-5 SECONDARY CLARIFIER NO. 3 PLAN AND SECTIONS  <br />C-6 SECONDARY CLARIFIER NO. 3 DETAILS  <br />S-1 STRUCTURAL GENERAL NOTES  <br />S-2 STRUCTURAL DETAILS   <br />Approximately 40 specifications are expected to be included in the Bid Documents, as shown in the <br />Preliminary List of Specifications below. Specifications will be prepared in 6-digit CSI format. The <br />Preliminary List of Specifications also indicates which specifications are planned to be provided for <br />each design submittal. Specifications submitted in prior submittals will be updated for subsequent <br />submittals based on Client comments received and coordination with the other specifications as <br />the design develops. The Client will provide an electronic copy of their most recent standard <br />Division 0 specifications, which BHC will tailor for the Project. <br />SPEC # Specification Name 50% 90% 100% <br />00 11 13 ADVERTISEMENT FOR BIDS  <br />00 21 13 INSTRUCTIONS TO BIDDERS  <br />00 22 13 SUPPLEMENTAL INSTRUCTION TO BIDDERS  <br />00 25 13 MANDATORY PRE-BID MEETING  <br />00 41 13 BID FORM  <br />00 43 13 BID SECURITY FORM  <br />00 45 13 BIDDER QUALIFICATION STATEMENT  <br />00 45 19 NON-COLLUSION AFFIDAVIT  <br />00 45 39 RCW 35.22.650 CERTIFICATION  <br />00 52 13 AGREEMENT FORM  <br />00 61 13 PERFORMANCE BOND AND PAYMENT BOND  <br />00 61 23 RETAINAGE BOND  <br />00 61 25 RETAINAGE ESCROW AGREEMENT  <br />00 63 63 CHANGE ORDER – AGREED  <br />00 63 95 CHANGE ORDER – UNILATERAL  <br />00 72 00 GENERAL CONDITIONS 