Laserfiche WebLink
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 7 <br />Category 2: For official use only / disclosure permissible by law. <br />00 73 43 WAGE RATE REQUIREMENTS  <br />01 11 00 SUMMARY OF WORK  <br />01 22 20 MEASUREMENT AND PAYMENT  <br />01 26 00 CONTRACT MODIFICATION PROCEDURES  <br />01 26 02 RFI TEMPLATE  <br />01 29 00 PAYMENT PROCEDURES  <br />01 29 73 SCHEDULE OF VALUES  <br />01 31 19 PROJECT MEETINGS  <br />01 32 11 CONSTRUCTION CONSTRAINTS AND SEQUENCE  <br />01 32 16 CONSTRUCTION PROGRESS SCHEDULE  <br />01 33 00 SUBMITTALS  <br />01 35 29 HEALTH AND SAFETY  <br />01 35 53 SECURITY PROCEDURES  <br />01 50 00 TEMPORARY FACILITIES AND CONTROLS  <br />01 60 00 MATERIALS AND EQUIPMENT  <br />01 74 23 FINAL CLEANING  <br />01 77 00 CLOSEOUT PROCEDURES  <br />01 79 39 RECORD DRAWINGS  <br />02 41 00 DEMOLITION, CUTTING, AND PATCHING  <br />03 00 02 CAST-IN-PLACE CONCRETE, REINFORCING STEEL, <br />AND GROUT  <br />05 50 00 METAL FABRICATIONS  <br />09 96 00 PROTECTIVE COATINGS  <br />35 22 00 HYDRAULIC GATES  <br />OPCCs will be based on the following American Association of Cost Engineering (AACE) <br />guidelines: <br />o The 50% OPCC will reflect a Class 2 estimate (applicable for 30% to 75% design) with an <br />expected accuracy range of -10% to +15%. <br />o The 90% and 100% OPCCs will reflect a Class 1 estimate (applicable for 65% to 100% design) <br />with an expected accuracy range of -5% to +10%. <br />Meetings: <br />BHC will conduct a 50% Design Review Meeting with the Client’s staff to discuss their review <br />comments. This meeting will be up to two (2) hours in duration and conducted remotely with two (2)