My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 6/12/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants 6/12/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 1:36:06 PM
Creation date
6/12/2026 1:35:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
6/12/2026
Council Approval Date
6/10/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Matt Gagner
Subject / Project Title
Engineering consultant services for the WPCF DS1 Gate Replacement and SC3 Launder Repair
Tracking Number
0005270
Total Compensation
$169,488.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 7 <br />Category 2: For official use only / disclosure permissible by law. <br />00 73 43 WAGE RATE REQUIREMENTS <br />01 11 00 SUMMARY OF WORK <br />01 22 20 MEASUREMENT AND PAYMENT <br />01 26 00 CONTRACT MODIFICATION PROCEDURES <br />01 26 02 RFI TEMPLATE <br />01 29 00 PAYMENT PROCEDURES <br />01 29 73 SCHEDULE OF VALUES <br />01 31 19 PROJECT MEETINGS <br />01 32 11 CONSTRUCTION CONSTRAINTS AND SEQUENCE <br />01 32 16 CONSTRUCTION PROGRESS SCHEDULE <br />01 33 00 SUBMITTALS <br />01 35 29 HEALTH AND SAFETY <br />01 35 53 SECURITY PROCEDURES <br />01 50 00 TEMPORARY FACILITIES AND CONTROLS <br />01 60 00 MATERIALS AND EQUIPMENT <br />01 74 23 FINAL CLEANING <br />01 77 00 CLOSEOUT PROCEDURES <br />01 79 39 RECORD DRAWINGS <br />02 41 00 DEMOLITION, CUTTING, AND PATCHING <br />03 00 02 CAST-IN-PLACE CONCRETE, REINFORCING STEEL, <br />AND GROUT <br />05 50 00 METAL FABRICATIONS <br />09 96 00 PROTECTIVE COATINGS <br />35 22 00 HYDRAULIC GATES <br />OPCCs will be based on the following American Association of Cost Engineering (AACE) <br />guidelines: <br />o The 50% OPCC will reflect a Class 2 estimate (applicable for 30% to 75% design) with an <br />expected accuracy range of -10% to +15%. <br />o The 90% and 100% OPCCs will reflect a Class 1 estimate (applicable for 65% to 100% design) <br />with an expected accuracy range of -5% to +10%. <br />Meetings: <br />BHC will conduct a 50% Design Review Meeting with the Client’s staff to discuss their review <br />comments. This meeting will be up to two (2) hours in duration and conducted remotely with two (2)
The URL can be used to link to this page
Your browser does not support the video tag.