My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 6/12/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants 6/12/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 1:36:06 PM
Creation date
6/12/2026 1:35:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
6/12/2026
Council Approval Date
6/10/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Matt Gagner
Subject / Project Title
Engineering consultant services for the WPCF DS1 Gate Replacement and SC3 Launder Repair
Tracking Number
0005270
Total Compensation
$169,488.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett <br />WPCF Gate Replacement and Clarifier Launder Repair – Scope of Services <br />May 18, 2026 <br />Page 11 <br />Category 2: For official use only / disclosure permissible by law. <br />Task 5 – Additional Services <br />This task has been included to cover additional work identified by the City not included in Tasks 1 through 4 <br />of the Scope of Services. A budget of $10,000 is assigned to this task. The budget for this task will only be <br />utilized as approved by the City in advance. <br />Work Tasks: <br />4.7 Task To Be Determined. <br />o Additional tasks to be determined, if and when required. <br />Receivables: <br />Written permission from the City is required to perform additional tasks and utilize the budget for <br />this task. <br />To be determined. <br />Deliverables: <br />To be determined. <br />Meetings: <br />To be determined. <br />Schedule <br />The following milestones are assumed based on the identified date for Notice-to-Proceed: <br /> Notice-to-Proceed July 2026 <br /> 50% Design Submittal September 2026 <br /> 90% Design Submittal December 2026 <br /> 100% Design Submittal February 2027 <br /> Final Bid Documents March 2027 <br /> Bid Advertisement March 2027 <br />If necessary, this schedule shall be equitably adjusted to allow for changes in scope or for delays beyond <br />BHC’s reasonable control. <br />Budget <br />The budget for this Scope of Services (Tasks 1 through 5), including other direct costs (ODCs), is <br />$169.488. A detailed breakdown of the budget is provided as Exhibit B. Compensation will be on a time and <br />materials, not-to-exceed basis per the attached budget estimate. Compensation shall not exceed the <br />budgeted amount without prior authorization from the Client. However, BHC may reallocate budget <br />between tasks as necessary due to Project requirements and adjust rates after the start of each new year
The URL can be used to link to this page
Your browser does not support the video tag.