My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 16 of 43 <br />A Critical Areas Technical Memo, completed under Task 4.1 will be provided for NEPA <br />and SEPA documentation that will describe critical areas within the Project action and <br />the avoidance of any direct impacts. <br />A 4(f)/6(f) Technical Memo will be provided by Perteet to illustrate and describe park <br />impacts to the Mill Creek Trail. Coordinate with the AGENCY for a letter of consent <br />from Everett Parks for NEPA review. AGENCY will facilitate 4(f) mitigation decisions <br />to be included in the design. <br />The AGENCY will submit NEPA related information to WSDOT, tentatively scheduled <br />to be prepared at or near the 30% PSE design level. <br />Perteet <br />weeks after submittal to facilitate review. It is assumed the AGENCY will prepare <br />information to submit the Preliminary CE form to WSDOT at or near the completion date <br />of the 30% PSE and the Final CE form will be submitted to WSDOT at or near 60% <br />PS&E submittal. <br />No additional federal or state permits or approvals or related documentation are scoped or <br />known to be required for the Project. <br />CONSULTANT will submit all deliverables/documents to the AGENCY after reviewing <br />Perteet’s submittals to the CONSULTANT. <br />Deliverables: <br />Preliminary NEPA CE Form. <br />Technical memoranda provided in Word or PDF format for: <br />o Cultural Resources <br />o Hazardous Materials <br />o 4(f) memorandum describing the extent of park impacts and the mitigation <br />alternatives <br />Review draft and final Critical Areas Technical Memo (Task 4.1) in PDF format <br />provided at or near 60% PSE submittal for use in SEPA documentation and HPA. <br />Draft and final SEPA Checklist in PDF format provided at or near 60% PSE submittal. <br />Final NEPA CE Form prepared for AGENCY signature and WSDOT submittal prepared <br />by Perteet at or near 60% PS&E submittal. <br />APE Memorandum, draft and final PDF by email. <br />Cultural Resources Assessment Report, draft and final PDF by email. <br />4.3 Biological Assessment <br />A biological assessment (BA) will be completed under NEPA due to federal funding nexus <br />requiring Section 7 ESA consultation. Perteet will prepare biological assessment documentation <br />based on the Project footprint and stormwater analysis that communicates anticipated effects <br />from the Project pursuant to WSDOT template format. Perteet will prepare the BA <br />documentation using the most current WSDOT BA Template available online. <br />This Task will include NEPA coordination and Perteet and CONSULTANT attendance at one <br />(1) meeting with WSDOT staff to confirm the scope of the BA documentation. Up to three (3) <br />meetings with WSDOT and AGENCY are assumed after the first submittal of the BA.
The URL can be used to link to this page
Your browser does not support the video tag.