My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 22 of 43 <br /> <br /> Once the Agency has reviewed the Draft Drainage Report with Draft water quality <br />treatment calculations, the water quality treatment calculations will be updated as <br />necessary for inclusion in the Final Drainage Report. <br />Deliverables: <br />Draft water quality treatment calculations (to be included in the Drainage Report). <br />Final water quality treatment calculations (to be included in the Drainage Report). <br />Pipe Conveyance Calculations <br />Perteet will prepare storm pipe conveyance capacity calculations for new pipe segments <br />associated with the Project site: <br /> Design Development (60%): Prepare preliminary pipe sizing calculations, using full-flow <br />conditions with the Manning equation and the Rational Method. <br /> Final design: Finalize pipe sizing calculations <br />Gutter flow and sag analysis: Prepare gutter flow and sag analysis (if low point is within <br />Project limits) to make sure the flow spread is contained with the roadway shoulders. <br /> <br />Assumptions: <br /> No new outfalls will be needed. The new conveyance system will tie into existing storm <br />drain systems that already lead to existing outfalls. It is further assumed that these <br />existing outfall systems have the capacity to accommodate Project flows. <br /> <br />Deliverables: <br /> Conveyance Calculations (to be included in the Drainage Report) <br /> Gutter flow analysis (to be included in the Drainage Report) <br /> <br />Drainage Report <br />Perteet will assemble a draft drainage report (60% design phase) and final drainage report (90% <br />design phase). The drainage report will include a written assessment and summary of the surface <br />water design features on the Project, summary of tables, water quality treatment calculations, <br />pipe capacity calculations, drainage basin maps, backwater analysis (Hydraulic Grade Line), and <br />supporting exhibits. <br /> <br />Deliverables: <br /> Draft Drainage Report at 60% PS&E phase (electronic PDF copy) <br /> Final Drainage Report at 90% PS&E phase (electronic PDF copy) <br /> <br />Coordination with Everett Projects <br />Perteet will coordinate with the AGENCY on its outfall and water quality improvement projects <br />in the Project vicinity. Perteet understands the downstream system at the base of the proposed <br />bridge will be upsized due to a capacity deficiency documented in the AGENCY’s stormwater <br />comprehensive plan. In addition, the AGENCY plans to install a regional water quality facility in <br />the vicinity of the reconstructed outfall. This work will include electronic and telephone
The URL can be used to link to this page
Your browser does not support the video tag.