Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 23 of 43 <br /> <br />communications with AGENCY staff and review of design documents provided by the <br />AGENCY. A conveyance analysis will be required to connect to the AGENCY’s proposed water <br />quality and outfall upgrades. <br /> <br />Permitting Support <br />Perteet will prepare stormwater figures and tables to support SEPA, NEPA, EIS, and Biological <br />Assessment permitting efforts. These will be modified from those prepared for the drainage <br />report and tailored to the needs of each permit. <br /> <br />5.2 Civil Engineering Plans Specs and Estimate <br />Construction plans, specifications, and an opinion of cost will be prepared based on the <br />recommendations identified in the existing TS&L and the stormwater design documentation. The <br />general limits of improvement will be along Everett Avenue, between the intersection of <br />Harrison Street and to the intersection of Railway Avenue. <br /> <br />In addition, improvements will include a mini-roundabout at intersection of Everett Avenue and <br />Railway Avenue. Improvements will also be made to Railway Avenue in the vicinity of the <br />intersection to accommodate truck turning and non-motorized improvements. <br /> <br />The design will include a cul-de-sac on Railway Avenue, east of the railroad tracks to <br />accommodate the closure of grade crossing. <br /> <br />Work Elements: <br />Right-of-way Plans (two (2) sheets, 1” = 50’ scale): Existing right-of-way and property lines will <br />be prepared by the survey subconsultant. Perteet will prepare the right-of-way plan based on the <br />existing right-of-way and proposed right-of-way needs. Parcel details and legal description will <br />be prepared by the survey subconsultant. <br /> <br />Construction Plans: A total of up to thirty eight (38) plan sheets are assumed to be necessary for <br />the final design construction plans. Specific final design construction plans are anticipated to <br />consist of the following sheets: <br /> Typical Roadway Sections (two (2) sheets, not to scale) <br /> Site Preparation and Erosion Control Plan and Details (six (6) sheets, 1” = 20’ scale) <br /> Paving Plan and Profiles (thirteen (13) sheets, 1” = 20’ scale) <br /> These plans will demonstrate the Project footprint and will include horizontal and vertical <br />alignment information, paving limits, and limits of cut/fill required. Three (3) sheets to <br />document details for curb ramps, and other miscellaneous details are included. <br /> Drainage Plan and Details (ten (10) sheets, 1” = 20’ scale) <br /> These plans will demonstrate the Project footprint, drainage conveyance and water <br />quality facilities. Three (3) sheets to document details for drainage facilities, and other <br />miscellaneous details are included. <br /> Utility Plans (four (4) sheets, 1” = 20’ scale) No new utilities are anticipated. Plans will <br />include relocation and adjustment of the existing utilities within the right-of-way. <br /> Wall Plan and Profile (three (3) sheets, not to scale)