My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 24 of 43 <br /> <br /> Wall alignment and profiles will be provided for the structural engineer to detail. <br />Channelization and Signing Plan and Details (five (5) sheets, 1” = 20’ scale) <br />These plans will include sign tables documenting sign type, size and location. One (1) <br />sheet to document details for channelization and signing is included. <br />Specifications <br />Perteet will prepare Contract Provisions ("Specifications") for the Project. These will include <br />Special Provisions for the items of work that are not covered by the 2018 WSDOT/APWA <br />Standard Specifications, any City of Everett General Requirements, and bid and contract forms. <br /> <br />Opinion of Cost <br />The opinion of cost will be based on unit prices and incorporate contingencies to account for the <br />level of completeness of plan preparation for each submittal, and to reflect past experience on <br />similar projects within the region. <br /> <br />Task 5.2.1 - 30% Plans and Opinion of Cost <br />The 30% plans will consist of Project footprint (plan view) information; drainage profile and <br />detail sheets are excluded from this submittal. The 30% design-level plans will consist of <br />approximately fifteen (15) plan sheets. <br /> <br />Work Elements: <br /> Prepare 30% design-level plans. <br /> Prepare 30% design-level opinion of cost. <br />Assumptions: <br /> The AGENCY will finalize the general geometric layout of the proposed improvements <br />through the review of the 30% submittal. The layout shall not be substantially modified <br />in a later design phase. A substantial change in the layout will constitute a change in <br />scope and will allow Perteet to negotiate additional compensation for the change. <br /> Proposed improvements will extend beyond the existing right-of-way. Right-of-way <br />plans will be developed after comments are incorporated from the 30% review. <br /> <br />Deliverables: <br /> 30% design-level plans (half-size (11”x17”), PDF) <br /> 30% design-level opinion of cost (PDF) <br /> Preliminary Right-of-way Plans <br /> <br />Task 5.2.2 - 60% Plans and Opinion of Cost <br />The 60% plans will consist of Project plan and profile information that are considered to be <br />constructible as shown, but not all of the information needed for construction, such as curb return <br />elevations and construction notes, will be provided. Some detail sheets and all landscaping and <br />traffic control sheets are excluded from this submittal. The 60% design-level plans will consist of <br />a complete plan set or thirty-eight (38) plan sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.