My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 25 of 43 <br /> <br />Work Elements: <br /> Prepare 60% design-level plans. <br /> Prepare 60% design-level opinion of cost. <br /> <br />Assumptions: <br /> Specifications will not be provided at the 60% design level. <br /> <br />Deliverables: <br /> 60% design-level plans (half-size (11”x17”), PDF) <br /> 60% design-level opinion of cost (PDF) <br /> 90% (for negotiations) Right-of-way Plan (PDF) <br /> <br />Task 5.2.3 - 90% Plans and Opinion of Cost <br />The 90% plans will consist of Project plan and profile information and construction notes, <br />elevation information, and details needed for construction. The 90% design-level plans will <br />consist of approximately thirty-eight (38) plan sheets. <br /> <br />Deliverables: <br /> 90% design-level plans (half-size (11”x17”), PDF) <br /> 90% design-level opinion of cost (PDF) <br /> 90% design-level specifications (PDF) <br />Final (Signed) Right-of-way Plan (PDF) <br />Task 5.2.4 - Final Plans and Opinion of Cost <br />The final plans will be bid-ready and include any comments received at the 90% submittal. <br /> <br />Deliverables: <br /> Bid-ready plans (1 signed, full-size (22”x34”) hard copy; 1 signed, half-size (11”x17”) <br />hard copy; signed, half-size PDF) <br /> Final opinion of cost (1 hard copy, PDF) <br />Bid-ready specifications (1 hard copy, PDF)
The URL can be used to link to this page
Your browser does not support the video tag.