Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 25 of 43 <br /> <br />Work Elements: <br /> Prepare 60% design-level plans. <br /> Prepare 60% design-level opinion of cost. <br /> <br />Assumptions: <br /> Specifications will not be provided at the 60% design level. <br /> <br />Deliverables: <br /> 60% design-level plans (half-size (11”x17”), PDF) <br /> 60% design-level opinion of cost (PDF) <br /> 90% (for negotiations) Right-of-way Plan (PDF) <br /> <br />Task 5.2.3 - 90% Plans and Opinion of Cost <br />The 90% plans will consist of Project plan and profile information and construction notes, <br />elevation information, and details needed for construction. The 90% design-level plans will <br />consist of approximately thirty-eight (38) plan sheets. <br /> <br />Deliverables: <br /> 90% design-level plans (half-size (11”x17”), PDF) <br /> 90% design-level opinion of cost (PDF) <br /> 90% design-level specifications (PDF) <br />Final (Signed) Right-of-way Plan (PDF) <br />Task 5.2.4 - Final Plans and Opinion of Cost <br />The final plans will be bid-ready and include any comments received at the 90% submittal. <br /> <br />Deliverables: <br /> Bid-ready plans (1 signed, full-size (22”x34”) hard copy; 1 signed, half-size (11”x17”) <br />hard copy; signed, half-size PDF) <br /> Final opinion of cost (1 hard copy, PDF) <br />Bid-ready specifications (1 hard copy, PDF)