My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 26 of 43 <br /> <br />WORK ELEMENT 6 UTILITY COORDINATION & DESIGN <br />This work element is performed by Perteet to provide utility coordination and design for the <br />Project. The utility coordination and design effort will include the following activities: <br />6.1 Utility Contacts and Data Collection <br />Perteet will coordinate with the affected utilities in the corridor to identify where conflicts arise <br />between the proposed corridor improvements and existing utilities. This task will include the <br />following services by Perteet: <br /> Establish contacts for each utility. Maintain and update a utility coordination log (Excel- <br />based spreadsheet). <br /> Coordinate with franchise utilities to collect record drawings, confirm locations, and <br />verify ownership of the utility facilities. <br /> Provide the effected utilities plans at the 30%, 60% and 90% submittal and coordinate <br />impacts with each of the utilities. <br /> <br />Assumptions: <br /> Franchise utilities will provide a record drawing to Perteet. <br /> Effort is limited to making initial contact with the utilities and collecting relevant record <br />drawings. Additional coordination efforts will be done in a subsequent phase of work. <br /> <br />Deliverables: <br /> Utility Contact and Coordination notes <br />
The URL can be used to link to this page
Your browser does not support the video tag.