Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 26 of 43 <br /> <br />WORK ELEMENT 6 UTILITY COORDINATION & DESIGN <br />This work element is performed by Perteet to provide utility coordination and design for the <br />Project. The utility coordination and design effort will include the following activities: <br />6.1 Utility Contacts and Data Collection <br />Perteet will coordinate with the affected utilities in the corridor to identify where conflicts arise <br />between the proposed corridor improvements and existing utilities. This task will include the <br />following services by Perteet: <br /> Establish contacts for each utility. Maintain and update a utility coordination log (Excel- <br />based spreadsheet). <br /> Coordinate with franchise utilities to collect record drawings, confirm locations, and <br />verify ownership of the utility facilities. <br /> Provide the effected utilities plans at the 30%, 60% and 90% submittal and coordinate <br />impacts with each of the utilities. <br /> <br />Assumptions: <br /> Franchise utilities will provide a record drawing to Perteet. <br /> Effort is limited to making initial contact with the utilities and collecting relevant record <br />drawings. Additional coordination efforts will be done in a subsequent phase of work. <br /> <br />Deliverables: <br /> Utility Contact and Coordination notes <br />