Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 30 of 43 <br /> <br /> Design coordination with structural engineer to coordinate integration of bridge <br />design features <br /> Manage landscape architect design effort on park design including planting and <br />hardscape design <br />Support permit requirements <br />Support public outreach effort <br />Provide review and input on project cost estimate <br />Deliverables: <br /> Outreach support materials –digital plans, diagrams, and 4 perspective renderings <br /> 60% PS&E <br />Assumptions: <br />Client interaction: four (4) team meetings, two (2) of which are in person <br />Schedule duration, assume 6 to 8-month duration for 60% design narrative schematic <br />drawings <br /> <br />8.4 98% Design Phase <br /> Develop and coordinate detailed design documents and specifications for pricing and <br />construction <br /> Design collaboration with design team to coordinate detailed integration of bridge <br />design features <br /> Manage landscape architect design effort on park design <br /> Respond to any permit comments <br />Support public outreach effort <br />Provide review and input on project cost estimate <br />Deliverables: <br /> Outreach support materials –digital plans, diagrams, and 4 perspective renderings <br />98% PS&E <br />Assumptions: <br /> Client interaction: four (4) team meetings, two (2) of which are in person <br /> Schedule duration, assume 8-month duration for 98% design narrative schematic <br />drawings <br /> <br />8.5 100% Final Documents <br /> Respond to owner comments and finalize detailed design documents and <br />specifications for pricing and construction <br /> Design collaboration with design team to finalize detailed integration of bridge design <br />features <br /> Finalize landscape design effort on park design <br /> Provide review and input on project bids <br />