My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 31 of 43 <br />Deliverables: <br />100% PS&E <br />Assumptions: <br />Assume nonpublic outreach in this phase <br />Client interaction: two (2) team meetings <br />Schedule duration, assume 2-month duration for 100% PS&E <br />8.6 Public Outreach Support <br />Support public outreach meetings with graphic diagrams, models, and /or illustrations <br />Assume one meeting in 60% and 98% design phases <br />8.7 Models, Illustrations, and Mock-up <br />Physical study model with site context (assume not bigger than 30”x30”) <br />Architectural illustrations for use with public outreach effort (4 views total at 60% <br />Design phase with updates at 98% Design phase) <br />Fabrication mock-up of architectural components (2 mock-ups) <br />Deliverables: <br />Outreach support materials – digital plans, diagrams, and four (4) perspective renderings <br />Support alternatives analysis report with written narratives, and graphics (to include <br />plans, diagrams, and perspective listed above) <br />Assumptions: <br />Client interaction: six (6) team meetings, two (2) of which are in person <br />Ten (10) team meetings <br />Schedule duration, assume one (1)-year duration for TS&L study and final report
The URL can be used to link to this page
Your browser does not support the video tag.