Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br />Page 31 of 43 <br />Deliverables: <br />100% PS&E <br />Assumptions: <br />Assume nonpublic outreach in this phase <br />Client interaction: two (2) team meetings <br />Schedule duration, assume 2-month duration for 100% PS&E <br />8.6 Public Outreach Support <br />Support public outreach meetings with graphic diagrams, models, and /or illustrations <br />Assume one meeting in 60% and 98% design phases <br />8.7 Models, Illustrations, and Mock-up <br />Physical study model with site context (assume not bigger than 30”x30”) <br />Architectural illustrations for use with public outreach effort (4 views total at 60% <br />Design phase with updates at 98% Design phase) <br />Fabrication mock-up of architectural components (2 mock-ups) <br />Deliverables: <br />Outreach support materials – digital plans, diagrams, and four (4) perspective renderings <br />Support alternatives analysis report with written narratives, and graphics (to include <br />plans, diagrams, and perspective listed above) <br />Assumptions: <br />Client interaction: six (6) team meetings, two (2) of which are in person <br />Ten (10) team meetings <br />Schedule duration, assume one (1)-year duration for TS&L study and final report