Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project – Phase 2 Full Design <br /> <br /> Page 33 of 43 <br /> <br /> The exact limits of the traffic control will be determined jointly between the AGENCY <br />and the Consultant and are dependent on full closure or partial closure. The plans will <br />conform as identified in the 11th Edition (December 2023) of the Manual on Uniform <br />Traffic Control Devices (MUTCD). All submittals will be sent to the CONSULTANT for <br />review prior to the CONSULTANT’s submittal to the AGENCY. <br /> <br />Deliverables: <br /> Updated Traffic analysis for selected alternative: <br />o Impacts on Everett Avenue/Grand Avenue area with the new mitigation to reduce <br />use of E. Grand Avenue for ingress/egress to EPIC site connection for trucks. <br />Mitigation to address impacts and/or diversion of trips on detour route <br /> Traffic Control Plan <br /> <br />