Laserfiche WebLink
10. Landscaping for wetponds, detention ponds, recreation, and parking areas including <br /> any fencing that is proposed or required; <br /> 11. Environmentally sensitive areas (ESA), buffers and setbacks with a specific lot detail <br /> planting plan for lots adjacent to ESA and required buffers; <br /> 12. Location of existing trees larger than twelve inches in diameter and identification of <br /> which trees will remain on site and be incorporated into the approved landscaping plan; <br /> and <br /> 13. Proposed topography, including rockeries and retaining walls. <br /> G. Requirements for Building Design and Elevations. All designs and elevations are to <br /> be prepared by or under the supervision of a qualified architect or designer. An applicant <br /> for a proposed cluster subdivision or short subdivision is required to submit preliminary <br /> building designs and elevations consistent with the following minimums: <br /> 1. The unit type proposed, showing an integrated architectural theme for the <br /> development; <br /> 2. The unit design and elevations showing how the proposed units comply with the <br /> development standards as defined in the city's Zoning Code for cluster subdivision or <br /> short subdivisions; <br /> 3. The unit design shall take into consideration the relationship and coordination of the <br /> indoor and outdoor spaces to provide for the optimum use of both; <br /> 4. The unit shall be designed to fit a specific lot, so that adequate off-street parking can <br /> be provided and still provide a pleasing streetscape; private yard areas or open space is <br /> provided similar to and functions as a typical single-family residence; if possible, the unit <br /> should provide for the potential for solar orientation for the unit and open space; if the <br /> project has natural areas and views, the orientation and design should take into <br /> consideration these amenities; and <br /> 5. The unit design shall adequately address public health, safety and welfare issues as <br /> defined by the city. <br /> EMC 18.16.030 Review process for the cluster alternative. <br /> A cluster alternative application shall be reviewed as a Review Process III as defined in <br /> Title 15 of this code, as amended, and Section 18.08.040 of this title. <br /> EMC 18.16.040 Approval of the cluster alternative. <br /> A. Approval of the cluster alternative by the hearing examiner shall constitute <br /> authorization for the applicant to develop the facilities and improvements as required in <br /> the preliminary approval. Development shall be in accordance with the plans and <br /> specifications as approved by the city subject to all conditions and requirements of the <br /> preliminary approval imposed by the hearing examiner. <br /> B. Time Limits for Preliminary Approval. A cluster alternative decision shall be issued <br /> by the hearing examiner within one hundred twenty days as defined in Title 15 of this <br /> code, as amended. <br /> C. Expiration of the Approval. Final approval must be obtained within five years of <br /> preliminary approval, after which time the approval will be void. An extension may be <br /> granted by the city for one year if the applicant has attempted in good faith to submit the <br /> final cluster plat or cluster short plat within the five-year time period; provided, however, <br /> 20 <br />