My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2536-01
>
Ordinances
>
Ordinance 2536-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 2:46:38 PM
Creation date
4/7/2014 2:46:33 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2536-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the applicant must file a written request with the director requesting the extension at least <br /> thirty days before expiration of the five-year period. <br /> EMC 18.16.050 Final application submittal requirements. <br /> A. Final Submittal Requirements. <br /> 1. All required final cluster plat or cluster short plat maps and documents shall be <br /> submitted and prepared in accordance with Section 18.08.070 of this title. <br /> 2. All required final site plans shall be submitted in final form consistent with the <br /> preliminary approval. The final plan shall be drawn to the specifications as defined in <br /> Section 18.16.020E of this chapter. The information required for the preliminary plan <br /> shall be provided in final form as determined by the city. <br /> 3. All required final landscaping plans shall be submitted in final form consistent with <br /> the preliminary approval. The final plan shall be drawn to the specification as defined in <br /> Section 18.16.020F of this chapter. The information required for the preliminary plan <br /> shall be provided in final form as determined by the city. <br /> 4. All required final building designs and elevations shall be submitted in final form <br /> consistent with the preliminary approval and Section 18.16.020G of this chapter. The <br /> applicant is required to provide final detailed plans and elevations. <br /> B. Survey for Cluster Subdivision or Cluster Short Subdivision. <br /> A survey is required for all cluster alternative projects and must be conducted by or under <br /> the supervision of a state of Washington registered land surveyor in accordance with <br /> Section 18.28.300 of this title. <br /> EMC 18.16.060 Final review and approval process. <br /> A. Required Review Process. <br /> 1. Prior to submittal of any preliminary cluster alternative to the city for final approval, <br /> the applicant must demonstrate compliance with all the conditions and requirements of <br /> the preliminary approval and prepare all of the necessary final documents as required in <br /> Section 18.16.050 of this chapter. <br /> 2. A final cluster subdivision or cluster short subdivision shall be reviewed using the <br /> review process as required for final subdivisions and short subdivisions as defined in <br /> Section 18.08.080 of this title. <br /> BE AND THE SAME IS HEREBY SUPERSEDED BY THE PROVISIONS OF <br /> THE CITY'S LOCAL PROJECT REVIEW PROCEDURES ORDINANCE <br /> SECTION 9: That Section 5A (EMC 18.20.010), Section 5B (EMC 18.20.020), Section <br /> 5C (EMC 18.20.030), Section 5D (EMC 18.20.040), Section 5E (EMC 18.20.050) and <br /> Section 5F (EMC 18.20.060) of Ordinance No. 2328-98 which reads as follows: <br /> EMC 18.20.010 Preapplication conference. <br /> Prior to submittal of a binding site plan application, a preapplication conference must be <br /> completed as defined in Section 18.08.010 of this code. <br /> EMC 18.20.020 Preliminary application submittal requirements. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.