My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2538-01
>
Ordinances
>
Ordinance 2538-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 2:59:07 PM
Creation date
4/7/2014 2:59:01 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2538-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permit shall obtain said permit, using Review Process IIA, IIIB or VB as determined by <br /> subsection 2.23.120(1) and Sections 20.12.110 and 20.12.120,prior to obtaining <br /> construction permits. Compliance with floodplain requirements shall be addressed within <br /> the scope of the shoreline permit process. The shoreline permit shall be obtained prior to <br /> application for building permits. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> 1. Shoreline Permit Required. All permitted and conditional uses within the <br /> floodway and flood fringe district which also meet the requirements for a shoreline <br /> permit shall obtain said permit, using the review processes as described in the City's <br /> Local Project Review Procedures Ordinance,prior to obtaining construction permits. <br /> Compliance with floodplain requirements shall be addressed within the scope of the <br /> shoreline permit process. The shoreline permit shall be obtained prior to application for <br /> building permits. <br /> SECTION 19: That Ordinance No. 1671-89 as amended by Section 16 of Ordinance <br /> No. 1729-90 and Section 18 of Ordinance No. 1849-92 (EMC 19.30.060 B(2)) which <br /> reads in part as follows: <br /> 2. Construction or substantial improvement of any building or structure and <br /> substantial improvement or reconstruction after damage of nonconforming buildings in <br /> the floodway and flood fringe not under the jurisdiction of the shoreline permit process <br /> shall be required to obtain a flood plain development permit. Permitted and conditional <br /> uses shall be reviewed using Review Process II.A and when in compliance with this <br /> section, shall be issued a flood plain development permit prior to application for building <br /> or public works permits. <br /> Normal maintenance and repair shall be exempt from obtaining a flood plain <br /> development permit. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> 2. Construction or substantial improvement of any building or structure and <br /> substantial improvement or reconstruction after damage of nonconforming buildings in <br /> the floodway and flood fringe not under the jurisdiction of the shoreline permit process <br /> shall be required to obtain a flood plain development permit. Permitted and conditional <br /> uses shall be reviewed using review process as described in the City's Local Project <br /> Review Procedures Ordinance and when in compliance with this section, shall be issued <br /> a flood plain development permit prior to application for building or public works <br /> permits. <br /> Normal maintenance and repair shall be exempt from obtaining a flood plain <br /> development permit. <br /> SECTION 20: That Ordinance No. 1671-89 (EMC 19.30.080 A) which reads as <br /> follows: <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.