My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2538-01
>
Ordinances
>
Ordinance 2538-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 2:59:07 PM
Creation date
4/7/2014 2:59:01 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2538-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> the subdivision code, when applicable. The procedure involved in final approval shall <br /> consist of the following: <br /> A. The final development plan shall be submitted to the planning department. <br /> B. The planning staff shall review the final development plan to see that it is in <br /> substantial compliance with the previously approved preliminary development plan. <br /> C. All schematic drawings presented in the preliminary development stage shall be <br /> presented in detailed form, i.e., landscaping, circulation, utilities, building location, etc. <br /> D. If the final plan is in substantial compliance with the approved preliminary plan, it <br /> shall be approved by the planning director using Review Process II.B. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> Final development plan—Contents—Final approval procedure. The final development <br /> plan shall consist of elements presented for preliminary approval and the requirement of <br /> the subdivision code, when applicable. The procedure involved in final approval shall <br /> consist of the following: <br /> A. The final development plan shall be submitted to the planning department. <br /> B. The planning staff shall review the final development plan to see that it is in <br /> substantial compliance with the previously approved preliminary development plan. <br /> C. All schematic drawings presented in the preliminary development stage shall be <br /> presented in detailed form, i.e., landscaping, circulation, utilities,building location, etc. <br /> D. If the final plan is in substantial compliance with the approved preliminary plan, it <br /> shall be approved using the review process described in the City's Local Project Review <br /> Procedures Ordinance. <br /> SECTION 27: That Ordinance No. 1671-89 (EMC 19.33.020)which reads as follows: <br /> Designation - Required review. <br /> The city will review and decide upon each proposal to designate an area as an historic <br /> overlay zone on the zoning map using the following procedure: <br /> A. Review by the historical commission, who shall make a recommendation to the <br /> planning commission, based upon the designation criteria listed in Section 33.040 of this <br /> chapter. <br /> B. Review by the planning commission using process VB, for nonproject site-specific <br /> rezones, described in Chapters 41 and 42 of this title. <br /> C. Review and final decision by the city council, following the process for nonproject <br /> site-specific rezones, described in Chapters 41 and 42 of this title. <br /> BE AND THE SAME IS HEREBY AMENDED TO READ AS FOLLOWS: <br /> Designation - Required review. <br /> The city will review and decide upon each proposal to designate an area as an historic <br /> overlay zone on the zoning map using the following procedure: <br /> Review by the historical commission, who shall make a recommendation to the planning <br /> commission, based upon the designation criteria listed in Section 33.040 of this chapter. <br /> Planning Commission's recommendation will be forwarded to City Council for Council's <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.