My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/07/06 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/07/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 9:01:55 AM
Creation date
7/13/2016 9:00:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 2 <br /> MSA will prepare an engineer's opinion of probable construction cost estimate based <br /> upon the 100%design that includes an appropriate contingency. <br /> 9.8 QA/QC—Perform in-house Quality Assurance/Quality Control(QA/QC)review of all <br /> submittals,the design plans,project manual and engineer's opinion of construction <br /> cost,prior to submitting to the City for review. <br /> 9.9 Utility Coordination—Coordinate with utility companies that are affected by the <br /> project, specifically in the EvCC easement area. Coordination includes submitting <br /> final 60%, 90% and 100%plans for review and technical input by utility companies. <br /> Plans will be distributed to franchised utilities in the project vicinity. A written record <br /> will be kept for all communication with utility providers. <br /> 9.10 Construction Schedule and Sequencing—Develop a construction schedule and <br /> sequencing plan for the project taking into consideration strategies for implementing <br /> improvements within the golf course and maintaining playability. This will include <br /> identifying project constraints and milestones in the specifications that will be applied <br /> to the project. The construction schedule and sequencing plan will be submitted as part <br /> of the 60%,90%and 100%submittal packages with elements included in the <br /> specifications. <br /> Assumptions: <br /> 1. City will compile and prepare the complete project manual and contract <br /> drawings incorporating both the N. Wetmore Stormwater Separation and the <br /> Legion Golf Course Stormwater Detention projects. MSA will submit plans <br /> and project specific specifications to the City to incorporate in the final bid- <br /> ready documents. <br /> 2. Contract drawings and specifications will comply with the City's adopted <br /> Engineering Design Standards, Standard Specifications and CAD Standards, <br /> as modified to suit the particular elements of this project. <br /> 3. City will conduct submittal reviews and provide comments within fifteen(15) <br /> working days. <br /> 4. No issues or restrictions associated with contaminated soils are anticipated in <br /> the proposed work areas. <br /> 5. Improvements to the golf course will be limited to the areas impacted by the <br /> proposed improvements or as otherwise identified in Tasks 1 or 2 of iConGolf <br /> Studio's work and modified in this Scope of Work. <br /> 6. MSA shall apply a Washington Professional Engineer's stamp with signature <br /> and date on each sheet of the drawings for the Legion Golf Course Stormwater <br /> Detention project. The City will stamp all other drawings and the Project <br /> Manual. <br /> 7. Structural design is limited to the detention pond control structures and <br /> retaining walls. <br /> • <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 Engineers/lil4nners Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.