My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-02.3(4) Obliteration of Pavement Markings <br /> (******) <br /> Remove pavement markings where shown on the Plans or where designated by the <br /> Engineer. Obliterate pavement marking until blemishes caused by the pavement <br /> marking removal conform to the coloration of the adjacent pavement. If the pavement <br /> is materially damaged by pavement marking removal operation, Contractor shall repair <br /> the pavement damage, at the Contractor's expense, to a condition equal to existing <br /> pavement that had no markings obliterated. Remove sand or other material deposited <br /> on the pavement as a result of removing stripes and markings as the Work progresses <br /> to avoid hazardous conditions. Accumulation of sand or other material that might <br /> interfere with drainage will not be permitted. <br /> 2-02.3(5) Abandon Pipe In-place <br /> (******) <br /> Existing pipes designated on plans to be abandoned shall be plugged on both ends as <br /> specified in 7-08.3(4). Where in conflict with new work, abandoned pipes shall be <br /> removed and disposed of as necessary to install the new work and the existing pipe <br /> that remains shall be plugged. If designated on Plans, fill abandoned in-place pipe with <br /> Controlled Density Fill as specified in 2-09.3(1)E. <br /> ' 2-02.3(7) Salvage <br /> (******) <br /> Carefully salvage and deliver to the Owner in good condition, all materials of <br /> recoverable value taken from the discarded facilities, unless otherwise indicated. <br /> Materials and things deemed of no value by the Engineer shall become the <br /> Contractor's property to be removed and properly disposed. <br /> Remove excess concrete, debris and dirt from castings and other materials the <br /> Engineer designates suitable for salvage and that are not to be re-used elsewhere on <br /> the Project. Deliver salvage castings and materials to the location designated by the <br /> ' Engineer. <br /> 2-02.3(8) Waste Disposal <br /> (******) <br /> Provide waste site for disposal of materials not required for construction. Arrange <br /> waste disposal at no expense to the City. Waste disposal shall meet the requirements <br /> of 2-03.3(7)C of the Standard Specifications. <br /> ' 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br /> backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br /> 1 2-02.3(10) Removal of Catch Basins, Manholes, Inlets or Sumps <br /> Excavate and completely remove the structure including, but not limited to, casting and <br /> outlet trap, concrete encasement and bricks, as applicable to each removal item listed <br /> ' in the Proposal. <br /> Plug existing connecting pipes that remain as specified in 7-08.3(4). Backfill shall be <br /> Gravel Borrow as specified in 9-03.14(1). Compact backfill to a minimum of 95 percent <br /> maximum density in accordance with 2-03.3(14)D. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 2-EARTHWORK April 2016 <br /> SP - 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.