Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS , <br /> cleaning, and debris removal, verified and documented by the City's Inspector. Provide truck r <br /> tickets to the City Inspector for verification. <br /> BID ITEM A-8 & B-8: SAWCUTTING PAVEMENT, FINAL JOINT CUT, UP TO 6-INCH <br /> THICKNESS <br /> Measurement and.Payment: Unit Price per Linear Foot <br /> The unit price per lineal foot for final sawcutting of asphalt or concrete road or street pavement, <br /> up to 6-inch in thickness, shall be full compensation for all labor, material, incidentals, tools, and <br /> equipment necessary to satisfactorily complete the work as defined in Section 2-02 of the I <br /> Standard Specifications and the Contract Documents. The unit price per lineal foot for final <br /> sawcutting of asphalt or concrete road or street pavement, up to 6-inch in thickness measured <br /> from the surface, includes the sawcutting necessary for the final joint between existing <br /> pavement and permanent HMA or cement concrete pavement. Sawcutting for the initial <br /> excavation and installation of sanitary sewer, storm drainage, and appurtenances shall be <br /> incidental to this bid item. <br /> The cost of cleanup by vacuum collection and disposal of the cuttings slurry is considered <br /> incidental to this bid item. <br /> Measurement for sawcuttingwill beper linear foot upto six inches of total average depth <br /> p <br /> measured from the surface along the true length of the final surface cut, as determined by the <br /> inspector. , <br /> BID ITEM A-9 & B-9: SAWCUTTING PAVEMENT, FINAL JOINT CUT, ADDITIONAL 1-INCH <br /> THICKNESS111 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per lineal foot for final sawcutting of asphalt or concrete road or street pavement <br /> thickness, for each 1-inch depth beyond the initial 6-inch thickness, shall be full compensation <br /> for all labor, material, incidentals, tools, and equipment necessary to satisfactorily complete the <br /> work as defined in Section 2-02 of the Standard Specifications and the Contract Documents. <br /> The unit price per lineal foot for final sawcutting of asphalt or concrete road or street pavement <br /> thickness, for each 1-inch depth beyond the initial 6-inch thickness, includes the sawcutting <br /> necessary for the final joint between existing pavement and permanent HMA or cement <br /> concrete pavement. Sawcutting for the initial excavation for installation of sanitary sewer, storm <br /> drainage, and appurtenances shall be incidental to this bid item. <br /> The cost of cleanup by vacuum collection and disposal of the cuttings slurry is considered 1 <br /> incidental to this bid item. <br /> Measurement for sawcutting will be per linear foot, per inch of additional depth of total average I <br /> depth measured from the surface along the true length of the final surface cut, as determined by <br /> the inspector. <br /> I <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division D—BID ITEM DESCRIPTIONS April 2016 <br /> SP -34 <br />