Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 <br /> BID ITEM A-10 & B-10: GRINDING/PLANING BITUMINOUS PAVEMENT <br /> Measurement and Payment: Unit Price per Square Yard <br /> The unit Contract price per square yard for Planing Bituminous Pavement shall be full payment <br /> for all costs incurred to perform the Work described in Section 5-04.3(14). <br /> BID ITEM A-11 & B-11: TRENCH EXCAVATION SAFETY SYSTEMS <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid item includes full compensation for safety system for trenches and all other <br /> excavations including, but not limited to, shoring, benching, bracing, excavation, sheeting, and <br /> trench box. This Work shall be accomplished in accordance with Divisions 1, 2, 7, and 8 of the <br /> Standard Specifications and Special Provisions. Payment per lump sum includes all equipment, <br /> materials, labor, installation, and removal, and all other work required to meet the trench <br /> excavation and safety system requirements. <br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and <br /> backfilled to the total quantity of pipe listed in the Proposal. <br /> ' BID ITEM A-12 & B-12: ROADWAY EXCAVATION INCLUDING HAUL <br /> Measurement and Payment: Unit Price per Cubic Yard. <br /> The unit price per cubic yard for roadway excavation, including haul, shall be full compensation <br /> for all costs incurred for excavating, removing, loading, hauling, and disposing of the materials. <br /> Also to be included in this bid item shall be the cost of grader work, or any other equipment <br /> required to remove existing soils to attain proper elevations as defined by the Contract <br /> Documents. <br /> Costs for compaction of native subgrade material will be included in the unit contract price for <br /> Asphalt Treated Base (Bid Item No. A-15 & B-13), Crushed Surfacing Top Course (Bid Item A-16 <br /> & B-14), Crushed Surface Base Course (Bid Item No. A-17 & B-15), and Gravel Borrow <br /> Including Haul (Bid Item No.A-18 & B-16). <br /> The cost of removing existing pavement surfaces and haul and disposal is incidental and shall <br /> be included in the unit price for this bid item. <br /> Roadway excavation will be measured by the cubic yard of material in-place and will be based <br /> on the calculated volume of material from the bottom of the below proposed surfaces to the top <br /> of the existing surface being removed. <br /> Proposed surfaces are: <br /> • crushed surfacing base course for alleyways, <br /> • crushed surfacing base course for the asphalt roadways, <br /> I • gravel borrow for the asphalt over concrete roadways, or <br /> • gravel borrow for the concrete roadways <br /> I _ <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division D—BID ITEM DESCRIPTIONS April 2016 <br /> SP -35 <br />